The substation has been furnished with the following equipment: three 160 mVA power transformers, SF6 distribution points (220 kV), 4-section packaged distribution system (20 kV).
The work includes: cable passageways (220 kV) from the “Meschanskaya” SS through the “Butirki” SS to the “Krasnoselskaya” SS.
Work: cable passageways (220 kV) from the “Novo-Kuzminki” SS through the “Chagino” SS.
The work includes: cable passageways (220 kV) at the substation – transition point to the “Saburovo” and “Baskakovo” airways. Total length – 1995 meters.
Scope of work: cable passageways (220 kV) at TPP-23, overall length – about 10200 meters.
The job took place at the transformer substations
The work is currently underway and includes: cable passageways (220 kV) from the substation – transition point No 208; total length – 3128 meters.
The range of jobs there included electrical equipment and other types of installation activities on the entire auxiliary equipment network.