+7 (495) 272-0871
Branches
in 5 cities of Russia
Divisions:
Moscow
Kostroma
Kurchatov
Smolensk
Plants:
Kurchatov
Design:
Kostroma engineering center
News
Company
About Us
List of Services
Structure
Clients and Partners
Testimonials
SRO licenses and certificates
Certificates
Information
For Shareholders
Services
Construction, installation and adjustment
General contract and design
Designing and manufacturing of equipment
Engineering, design works
Software development and support
Our Equipment
Manufacturing Capabilities
Environmental Protection
Projects
Contacts
Log in
Главная
Новости
Works performed by Kostroma branch in July-August, 2013
16.09.2013
1. Nyagan SDPS. 1st, 2nd, 3rd launching complexes. (July)
Launching complex No. 1.
Territory
:
Installation of networks of external and security lighting.
Launching complex No. 2.
Office of electric devices:
1 . Installation of the electric equipment;
2 . Laying and connection of power and control cables;
3 . Lighting installation;
4 . Installation of current distributors 6 and 20 of kV.
Turbine office:
1 . Installation of a cable metalwork;
2 . Installation of protective pipes;
3 . Installation of networks of lighting;
4 . Installation of networks of systems of grounding;
5 . Installation of PILES and And TMCh systems;
6. Installation of pulse lines and shutoff valves;
7 . Installation of equipment express of laboratory of automatic chemical control;
8 . Laying of a power cable 0,4 kV;
9 . Laying of a control cable;
10 . Installation of a welding and test network;
11 . Installation of PILES and A GT, PT, generator, noise-protective casing, diffuzor;
12 . Installation of system of detection of a fire of MINIMAX;
13 . Installation of system of power supply of installations of fire extinguishing, communication systems and alarm system;
14 . Electric installation work on a site of open installation of transformers;
15 . Preparation for turbine statement on axle.
Boiler office:
1 . Installation of a cable metalwork;
2 . Installation of protective pipes;
3 . Installation of systems of lighting;
4 . Installation of equipment of PILES and A KU2;
5 . Installation of stands, connecting boxes, news agency PILES pulse lines.
Territory:
1 . Laying of a power and control cable on platforms.
Launching complex No. 3.
OETU:
1 . Installation of the electric equipment;
2 . Installation of current distributors 6 and 20 of kV;
3 . Installation of a cable metalwork;
4 . Installation of system of grounding.
Territory:
1 . Installation of a cable metalwork of a platform from No. 3 group of companies;
2 . Laying of a power cable on platforms to No. 3 group of companies.
2. Nyagan state district power station. 1,2,3rd starting complexes (August)
Launching complex No. 1.
Territory:
1 . Installation of networks of external and security lighting;
2 . Installation of PILES and And to OVK.
Launching complex No. 2.
Department of electric devices:
1 . Installation of the electric equipment:
2 . Laying and connection of power and control cables;
3 . Installation of networks of lighting;
4 . Installation of the current distributor of 6 kV and 20 kV.
Turbine department:
1 . Laying of power and control cables;
2 . Installation of protective pipes;
3 . Installation of networks of lighting;
4 . Installation of PILES and And TMCh systems;
5 . Installation of pulse lines and shutoff valves;
6 . Installation of the monitoring system of leakages of hydrogen;
7 . Installation of equipment of PILES and A PT;
8 . Installation of PILES and A BOU;
9 . Automatic equipment installation on a site of open installation of transformers.
Boiler office:
1 . Installation of networks of lighting;
2 . Installation of PILES and A KU2;
Launching complex No. 3
OETU:
1 . Installation of the electric equipment;
2 . Installation of networks of grounding;
3 . Installation of the current distributor 6 and 20 of kV;
4 . Shch PT installation of equipment;
5 . Installation of networks of lighting.
Turbine office:
1 . Installation of electric equipment of GPM;
2 . Installation of a cable metalwork;
3 . Installation of equipment of electric part of KVOU.
Territory:
1 . Laying of a power cable on platforms to No. 3 group of companies;
1 . Electric installation work in the camera of switchings around No. 3 group of companies.
JSC Yarenergo. Yaroslavl. Substation Novoselka.
1 . Dismantle of an existing case of the main protection;
2 . Installation of a new case of the main protection;
3 . Connection of cable lines in a case of the main protection.
JSC Slavneft-YaNOS. Yaroslavl.
Scheme change of electric supply Shop№13. (TSB):
1 . Installation and PNR of cases of AVR;
2 . Installation and PNR of cases of ShR;
3 . Installation and PNR of cases PROBE of a power post of SP-1;
4 . Installation of cable designs on TSB territory;
5 . Dismantle of the equipment switchgear RU-0,4 of kV and
switchgear
RU-6 of kV VTP-663;
6 . Dismantle of the equipment of RZA in TP-663.
Branch Kostroma SDPS OAO of Inter RAO.
Modernization of CSG-6 by kV of the block No. 4 regarding arc protection:
1 . Installation of equipment of automatic systems of arc protection;
2 . Laying of a control cable in CSG-6 kV;
3 . Installation of cases of automatic equipment;
4 . PNR of system of arc protection in CSG-6 kV.
Modernization of the automated system of lighting on energy saving light sources (oil hardware-based building No. 1 liter 2, a warehouse No. 10)
1 . Replacement of lamps;
2 . Replacement of guards of lighting;
3 . Replacement of cable routes;
4 . Installation of cable lines;
5 . Carrying out PNR.
JSC FGC UES - Main Power Networks of the Center. Reconstruction of substation of 220 kV Kineshma:
1 . Dismantle of existing joint stock banks, ShchPT, ZVU;
2 . ShchPT-1, UZP-1, UZP-2 installation;
3 . Installation of racks and storage batteries;
4 . Filling of electrolyte, joint stock bank test;
5 . Laying of a power and control cable in AB.
JSC FGC UES - Main Power Networks of the Center. Reconstruction of substation of 220 kV Steklovolokno:
1 . Transfer of consumers from existing ShchPT on again mounted ShchPT-1;
2 . Dismantle of ShchPT-2 and No. 4;
3 . Electrolyte filling in joint stock bank No. 2, test of joint stock bank No. 2;
4 . Dismantle of the high-voltage equipment in AT-2 cell to the
outdoor switchgear
ORU of 220 kV;
5 . Vysokovoltnogooborudovaniye installation in AT-2 cell to the
outdoor switchgear
ORU of 220 kV;
6 . Installation of OPN-110 of kV in AT-2 cell to the
outdoor switchgear
ORU of 110 kV;
7 . Laying of a power and control cable on the territory of outdoor switchgear ORU-220 of kV.
8 . Installation of a rigid and flexible busbar in AT-2 cell to the
switchgear
ORU of 220 kV;
9 . Painting of a protection of substation.
Ivelektronaladka
JSC
. Reconstruction of substation of 220 kV Galich:
1 . Installation of cases of YaVZ;
2 . Installation of the RZA, TN panels;
3 . Installation of a control cable on the territory of
outdoor switchgear
ORU-220 of kV;
4 . Installation of a control cable in OPU.
More photo