Works performed by Kostroma branch in July-August, 2013

16.09.2013
1. Nyagan SDPS. 1st, 2nd, 3rd launching complexes. (July)
Launching complex No. 1.

Territory:
  • Installation of networks of external and security lighting. 
Launching complex No. 2. 

Office of electric devices:
1 . Installation of the electric equipment;
2 . Laying and connection of power and control cables;
3 . Lighting installation;
4 . Installation of current distributors 6 and 20 of kV.

Turbine office:
1 . Installation of a cable metalwork;
2 . Installation of protective pipes;
3 . Installation of networks of lighting;
4 . Installation of networks of systems of grounding;
5 . Installation of PILES and And TMCh systems;
6.  Installation of pulse lines and shutoff valves;
7 . Installation of equipment express of laboratory of automatic chemical control;
8 . Laying of a power cable 0,4 kV;
9 . Laying of a control cable;
10 . Installation of a welding and test network;
11 . Installation of PILES and A GT, PT, generator, noise-protective casing, diffuzor;
12 . Installation of system of detection of a fire of MINIMAX;
13 . Installation of system of power supply of installations of fire extinguishing, communication systems and alarm system;
14 . Electric installation work on a site of open installation of transformers;
15 . Preparation for turbine statement on axle.

Boiler office:
1 . Installation of a cable metalwork;
2 . Installation of protective pipes;
3 . Installation of systems of lighting;
4 . Installation of equipment of PILES and A KU2;
5 . Installation of stands, connecting boxes, news agency PILES pulse lines.

Territory:
1 . Laying of a power and control cable on platforms.

Launching complex No. 3.
OETU:

1 . Installation of the electric equipment;
2 . Installation of current distributors 6 and 20 of kV;
3 . Installation of a cable metalwork;
4 . Installation of system of grounding.
Territory:
1 . Installation of a cable metalwork of a platform from No. 3 group of companies;
2 . Laying of a power cable on platforms to No. 3 group of companies. 
 
2. Nyagan state district power station. 1,2,3rd starting complexes (August)

Launching complex No. 1.
Territory:
1 . Installation of networks of external and security lighting;
2 . Installation of PILES and And to OVK.

Launching complex No. 2.
Department of electric devices:

1 . Installation of the electric equipment:
2 . Laying and connection of power and control cables;
3 . Installation of networks of lighting;
4 . Installation of the current distributor of 6 kV and 20 kV.

Turbine department:
1 . Laying of power and control cables;
2 . Installation of protective pipes;
3 . Installation of networks of lighting;
4 . Installation of PILES and And TMCh systems;
5 . Installation of pulse lines and shutoff valves;
6 . Installation of the monitoring system of leakages of hydrogen;
7 . Installation of equipment of PILES and A PT;
8 . Installation of PILES and A BOU;
9 . Automatic equipment installation on a site of open installation of transformers.

Boiler office:
1 . Installation of networks of lighting;
2 . Installation of PILES and A KU2;

Launching complex No. 3
OETU:

1 . Installation of the electric equipment;
2 . Installation of networks of grounding;
3 . Installation of the current distributor 6 and 20 of kV;
4 . Shch PT installation of equipment;
5 . Installation of networks of lighting.
Turbine office:
1 . Installation of electric equipment of GPM;
2 . Installation of a cable metalwork;
3 . Installation of equipment of electric part of KVOU.
Territory:
1 . Laying of a power cable on platforms to No. 3 group of companies;
1 . Electric installation work in the camera of switchings around No. 3 group of companies.
JSC Yarenergo. Yaroslavl. Substation Novoselka.

1 . Dismantle of an existing case of the main protection;
2 . Installation of a new case of the main protection;
3 . Connection of cable lines in a case of the main protection.

JSC Slavneft-YaNOS. Yaroslavl.
Scheme change of electric supply Shop№13. (TSB):


1 . Installation and PNR of cases of AVR;
2 . Installation and PNR of cases of ShR;
3 . Installation and PNR of cases PROBE of a power post of SP-1;
4 . Installation of cable designs on TSB territory;
5 . Dismantle of the equipment switchgear RU-0,4 of kV and switchgear RU-6 of kV VTP-663; 
6 . Dismantle of the equipment of RZA in TP-663.

Branch Kostroma SDPS OAO of Inter RAO.
Modernization of CSG-6 by kV of the block No. 4 regarding arc protection:

1 . Installation of equipment of automatic systems of arc protection;
2 . Laying of a control cable in CSG-6 kV;
3 . Installation of cases of automatic equipment;
4 . PNR of system of arc protection in CSG-6 kV.

Modernization of the automated system of lighting on energy saving light sources (oil hardware-based building No. 1 liter 2, a warehouse No. 10)

1 . Replacement of lamps;
2 . Replacement of guards of lighting;
3 . Replacement of cable routes;
4 . Installation of cable lines;
5 . Carrying out PNR.

JSC FGC UES - Main Power Networks of the Center. Reconstruction of substation of 220 kV Kineshma:

1 . Dismantle of existing joint stock banks, ShchPT, ZVU;
2 . ShchPT-1, UZP-1, UZP-2 installation;
3 . Installation of racks and storage batteries;
4 . Filling of electrolyte, joint stock bank test;
5 . Laying of a power and control cable in AB.

JSC FGC UES - Main Power Networks of the Center. Reconstruction of substation of 220 kV Steklovolokno:

1 . Transfer of consumers from existing ShchPT on again mounted ShchPT-1;
2 . Dismantle of ShchPT-2 and No. 4;
3 . Electrolyte filling in joint stock bank No. 2, test of joint stock bank No. 2;
4 . Dismantle of the high-voltage equipment in AT-2 cell to the outdoor switchgear ORU of 220 kV; 
5 . Vysokovoltnogooborudovaniye installation in AT-2 cell to the outdoor switchgear ORU of 220 kV; 
6 . Installation of OPN-110 of kV in AT-2 cell to the outdoor switchgear ORU of 110 kV; 
7 . Laying of a power and control cable on the territory of outdoor switchgear ORU-220 of kV.
8 . Installation of a rigid and flexible busbar in AT-2 cell to the switchgear ORU of 220 kV; 
9 . Painting of a protection of substation.

Ivelektronaladka JSC. Reconstruction of substation of 220 kV Galich:

1 . Installation of cases of YaVZ;
2 . Installation of the RZA, TN panels;
3 . Installation of a control cable on the territory of outdoor switchgear ORU-220 of kV; 
4 . Installation of a control cable in OPU.