Work of the Smolensk branch, May 2012

02.07.2012
  1. Affiliate of “Rosenergoatom Concern”, Smolensk NPP, Desnogorsk.
    • Installation of some wielding equipment inside the 1st power unit;
    • Renovation of automated firefighting alarm system in PU 3;
    • Installation of a fire alarm system in the administrative building;
    • Renovation of 6/0,4 kV equipment in PU2;
    • Renovation of the control equipment for the 3rd mode ventilation system (bomb shelter);
    • Installation of electric equipment at the onshore pump station, including the replacement of some pumps;
    • Remodeling of the service unit building (reconstructed into a study center for newly-hired technical and repair workers) Commissioning/testing activities;
    • On-site safety systems - a range of relevant activities toward bringing the system up to code (Smolensk NPP). EC&I equipment at the spare boiler house (installation);
    • Manufacturing and delivery of primary EC&I equipment;
    • Finishing of the heat-monitor and measurement control building;
    • Metal works (installation); electric calibration work on the spare control equipment.
  2. OOO “Schit”.
    • Nuclear waste reprocessing system. Launch area. Special building;
    • Final-stage/commissioning activities at the first launch area.
  3. OAO “QUADRA” “TPP-2”, Smolensk.
    • Electric equipment renovation work, incl. EC&I.
  4. "Smolenskenergo” – an branch of OAO “MRSK Centra”.
    • Technical/system expansion activities in Smolensk;
    • Electric work (power feed setup) for the "Tyagovaya" SS;
    • Capacitance current compensation systems (installation) at the “Yuznhaya” and “Smolensk” substations – both in Smolensk. Power system setup for the State Archive Organization building;
    • Renovation of RP-7 (Kozlova St., Smolensk).
  5. OAO “ECM” – a 220/20 kV substation in Novo-Kuzminki (Moscow Region); capacity - 2 by 160 mWA.
    • Two SF6 switchgears (220 kV) at the “Novo-Kuzminki” substation for further connection to the “Gorkovskaya” substation.
  6. OAO “Centroelectronaladka".
    • Renovation work at the temporary power-feed system “Vykhinskaya-2” station.