Новости

Work done by the Smolensk branch in April, 2011

26.04.2011

 

 

Construction work has been underway at the Smolensk NPP, OOO SFPSK “Schit”, OAO “FSK EES” - MES Center

1. An OAO “Rosenergoatom Concern” branch. Smolensk NPP (Desnogorsk).

  • Renovation work at 1st power unit. Construction work aimed toward the implementation of SCK “Ska-la-Micro”, KSKUZ and other systems.
  • Work toward the renewal of PU 1.
    • Implementation of a fully automated integrity-control system ACOTT.
    • Other electrical work.
    • Replacement of firewater piping; Construction work; Corrosion protection for the firewater pipes;
  • Removal of vibration-testing equipment at TG-1.2, PU 1 Installation of a new vibration-testing system;
  • 1st line. 1st power unit. Main building. Machinery room. Drain cooler system.

 

2. OOO SFPSK “Schit”

  • Radioactive waste reprocessing facility. Launch facility. Special departments.Electrical work.

 

3. An OAO “Quadra” branch - “Smolensk region generators” SS, Smolensk TPP-2 (Smolensk)

  • Repair work at electrical equipment of TPP-2.

 

4. OAO “Quadra Generating Company” (a branch of “TGK No4” - Smolensk region generators)

  • Booster pump station No3 at TPP-2, Verkhni Volok St.
  • Expansion of SSG-110 kV, incl. from-scratch creation of ZRU-6kV with subsequent connection to PNS No3 (2nd Verkhni Volok st., Smolensk) Electrical work.

 

5. Abranch of OAO “MRSK Centra” - “Smolenskenergo”

  • Renovation of SSU.
  • Construction of a new power-supply network segment (“Vodozabor”) for consequent connection of a Smolensk parking lot.
  • Construction of a new power segment for further connection of a Smolensk garage lot.

 

6. OAO “Elektrocentromontazh”

  • Electrical work at the “Novo-Kuzminki” SS; transformer capacity – 2x160 mVA.

 

7. OAO “FSK EES” - MES Centra Expansion of the “Orbita” SS Technical connection activities at OAO “Kalugaenergo” SS

Installation, removal activities.