Projects of the Kostroma branch, June 2011

Projects of the Kostroma branch, June 2011
04.07.2011

 

The “E-4” group. Nyagan GRES

  1. Main building (No 1). Power supply framework (Siemens manufacture):
    • Installation of several CTs;
    • Installation of control boxes at the generator output;
    • Installation of temperature detectors and vibration sensors at bearing 7 of the vapor turbine;
    • Installation of control boxes, cable joints/constructions, lamps in the air-cleaning machinery;
  2. Liquid fuel dept
    • Fire-safety system, installation;
    • Commissioning of a 0.4 kV switchgear;
  3. Electrical equipment dept at building 1:
    • Cable joints, braces, supporting constructions, passageways – installation work;
    • Cordage of control equipment (Siemens manufacture, 3 units x 17 tons).
  4. Cable overpass from OVK to GK, AK:
    • Installation of cable boxes, KKB-0.95/0,6
    • Cable trays;
    • Cable laying through/around the overpass (6 kV);
    • Control and power cable work across the overpass;
  5. Auxiliary building:
    • Installation of NKU-SESch boxes in the RUSN-6/0.4kV building.

 

OAO “TGK-2.” Expansion of the Nizhni Novgorod TPP with a new GTE-160 gas-turbine plant

  1. 330 kV outdoor switchgear:
    • Installation of the primary high-voltage equipment at open-air section of SSG
    • Lighting system setup, cable constructions, control/switch boards, general cable laying work;
    • Cable laying work all across the ground, connection, wiring;
    • Grounding cable, lightning protection system setup;
    • Installation of a DC control boards, batteries;
    • Boxes: RPS, PAA, EC&I, relevant cable wiring.
  2. The TPP main building and GTE-160 power unit:
    • Cable overpass – full installation from SSG-330kV to the main building and primary PU
    • Installation of RUSN-0.4 kV, GTE and RUSN-0.4 KU, cable work;
    • Replacement of 3 KRU-6kV sections in the main building;
    • Equipment installation in the supporting facility of the primary PU
    • Lightning protection system setup at main building and primary PU

 

OAO “Slavneft-Yanos”, Yaroslavl. Renovation of GPP-10

  1. Installation of RPS GPP-10 systems;
  2. Lighting/heating system setup;
  3. Installation of 2 35/6 kV transformers, capacity – 25 mVA at GPP-10
  4. Installation of 2 CH (TCH-6x0,4 kV) transformers, capacity

 

GU OAO “TGK-2”, YaroslavlGas/heat metering systems – renovation work

Metering system installation at the “Lyapino” boiler-house plant

An OAO “OGK-3” branch. Kostroma GRES

  1. Renovation of the video surveillance system;
  2. Renovation of cable passageways at SSG-220kV.

 

An OAO “OGK-2” branch. Troitsk GRES

  1. Electrical equipment provision for reconstruction work at KRU-6kV and RU-0.4kV, power unit 8
  2. Metalwork constructions, power/control cable laying for electrical equipment installed at PU 8;

 

 \\  \\