1. Rosenergoatom branch Smolensk NPP. Desnogorsk.
· Reconstruction
· Flame-retardant coating repair at the cable runs of the unit #1.
· Installation of the sertified water level indicators, detecting water level decrease in the spent fuel pools of the unit #1, 2, 3.
· Replacement of the radiation monitoring system of the working site and defensive accident-prevention shelter at the power unit #2.
· Air separation units replacement of the nitrogen-oxygen plant of the first stage.
· Nuclear waste reprocessing complex (KP RAO).
· Electrical installation works.
· Instrumentation and controls stands installation (KIPiA).
· Radiation monitoring system installation.
· Fire alarm installation.
· Equipment installation.
2. NIKIMT-Atomstroy OAO
· Storage and management of spent nuclear fuel. Spent nuclear fuel storage (HOYaT). Reconstruction. Extension. Electrical installation works.
3. IDGC of Centre OAO
· Cable lines repair in Smolensk.
· Cable lines installation at the object “KL-6kV, TP-6/0.4kV, KL-0.4kV construction for technical connection of the electrical plants of the Grazhdanstroy, OOO for IDGC of Centre, OAO (Smolenskenergo branch) needs.”
4. Energostroymontazh, OOO
· 8th microdistrict trolley lines.
5. E.ON Russia, AO
· 220/35kV outdoor switchgear cable ducts and concrete structures repair at Smolensk SDPS.
6. ECM-Novovoronezh.
· Elecrical installation works at electrical equipment of the PGU power unit #9 of the Serov SDPS – “OGK-2”, OAO branch – at “Serov SDPS territory. PGU-420 (9, 10) units construction separating the first launch system of the unit #9.
Works planned for September 2015
· Nuclear waste reprocessing complex (KP RAO) of Smolensk NPP. Electrical installation works.
5. E.ON Russia, OAO