1. Rosenergoatom branch Smolensk NPP. Desnogorsk.
· Reconstruction
o Power unit #1 facilities lighting system modernization.
o Consumers power supply scheme modernization of the conditioning refrigerating station (HSK). Electrical installation works.
o Replacement of vinyl-plastic air ducts in generator circuit-breakers’ facilities at power unit #1.
o Humidifiers installation in mission systems facilities of power unit #1.
o Replacement of the radiation monitoring system of the working site and defensive accident-prevention shelter at the power unit #2.
o First stage nitrogen-oxygen plant #1 air separation units replacement (AKS-1). Construction works.
· Nuclear waste reprocessing complex (KP RAO).
o Electrical installation works.
o Instrumentation and controls stands installation (KIPiA).
o Radiation monitoring system installation.
2. NIKIMT-Atomstroy OAO
· Storage and management of spent nuclear fuel. Spent nuclear fuel storage (HOYaT). Reconstruction. Extension. Electrical installation works.
3. IDGC of Centre OAO
· Cable lines repair in Smolensk.
· Cable lines installation at the object “KL-6kV, TP-6/0.4kV, KL-0.4kV construction for technical connection of the electrical plants of the Grazhdanstroy, OOO for IDGC of Centre, OAO (Smolenskenergo branch) needs.”
4. Energostroymontazh, OOO
· 8th microdistrict trolley lines.
5. E.ON Russia, OAO
· 35/220kV outdoor switchgear cable ducts and concrete structures repair at Smolensk SDPS.
· Elecrical equipment power supply of the boiler compartment of the 3rd power unit and electrical installation works connected to main board transfer at the Berezovskaya SDPS.
6. Dorojnik, OOO, Bryansk.
· Fiber-optic communication lines installation in the telephone conduit, in the house distributing systems and residential houses low-voltage lines, optical distribution frames and terminal boxes installation (Bryansk, Bejitsky and Sovetsky districts).
Works planned for May 2015
o Replacement of the radiation monitoring technical equipment, which controls vehicular exit from the NPP territory.
· Nuclear waste reprocessing complex (KP RAO) of Smolensk NPP. Electrical installation works.