Works performed by Kurchatov branch in November 2014

03.12.2014
  1. Kursk NPP

    • 3rd power unit and spent fuel storage (HOYaT). Radiation control system (SRK) modernization.
      • T-joints, valves and detecting devices installation, installation of control cables.

    • 3rd power unit. Operating lifespan extension. Air ventilation and conditioning system.
      • Equipment installation, cable laying, ducts installation and automated-circuit breakers replacement.

    • 3rd power unit. Operating lifespan extension. SF6 circuit breakers’ springs charging.
      • Power cable laying.

    • 3rd power unit. Operating lifespan extension. Normal and emergency power system.
      • Busbars replacement.

    • 3rd power unit. Operating lifespan extension. PTK SKU RO (Instrumentation and control system hardware and software complex for reactor building).
      • Cable transits sealing. Coating cables with “OGRAX”.

    • 4th power unit. Operating lifespan extension. Electrical works of the main building, 750kV outdoor switchgear and BNS-3 (on-shore pumping station) equipment modernization.
      • Cable transits sealing. Cables coating.

    • 4th power unit. Operating lifespan extension.
      • Sockets installation. Cable cores connection.

    • 330 kV outdoor switchgear (ORU). 20 sets of RNDZ disconnectors replacement.
      • Power and control cable laying.

    • 330 kV outdoor switchgear (ORU). Disconnectors and voltage transformers replacement.
      • VT-1 (3 phase) replacement. Control cable laying.

  2. Kursk NPP-2

    •   Structured cabling system delivery and installation in general contractor’s modular building at the Kursk NPP-2 1st and 2nd power units building sites. 
      • Structured cabling system and server equipment installation.


  3. Novovoronezh NPP-2

    •   Instrumentation and control equipment and automatic process control system equipment installation at the 10UKC reactor auxiliary building. 
      • Pulse tube installation, cable laying, cable metalwork installation, lamps installation.


  4. Novovoronezh NPP 5th power unit

    • Special water treatment facility instrumentation and control system (SKU SVO) modernization in terms of operating panels and 5th power unit detector panels.
      • Embedded special water treatment facilities (SVO) and metalwork equipment dismantling and installation, cable cores disconnection in special water treatment facilities (SVO).

  5. Mikhailovsky GOK (mining and processing plant)

    • Pelletization block of the kilning machine No. 3 technological complex. Mixing and homogenization section.
      • Cable metalwork and equipment installation. Cable laying.

  6. Novogorkovskaya HEPS

    • Novogorkovskaya HEPS reconstruction with combined cycle gas turbine installation.
      • Power cable laying, lighting installation.