+7 (495) 272-0871
in 5 cities of Russia
№
Customer/Object
Type of work
1
Novovoronezh NPP
Substation of 220 kV Novaya
Dismantle of ferroconcrete support
Dismantle of assembly ferroconcrete cable trays
Arrangement of ferroconcrete bases
Outdoor switchgear ORU of 500 kV
Arrangement of transition to the electric channel
Sikla system installation for cable laying
Arrangement of transition under the road
Laying of ferroconcrete trays
Arrangement of calling to rotator OPU 1
Arrangement of calling to rotator OPU 2
Installation of a metalwork
Installation of basic racks for flights
Dismantle of electrical equipment
Installation of the gas-insulated switch of type HPL550B2
Installation of grounding of electrical equipment
Computerized system on individual dosimetric control (ASIDK)
Building of walls.
Arrangement of covering
Installation of window and door blocks.
Finishing works.
Connection of workplaces on measurement of dosimeters to the existing computerized system on individual dosimetric control ASIDK network
Electrical lighting.
Installation of system of heating, water supply, installation of sewerage.
2
Novovoronezh NPP (under construction)
Switchgear of 10 kV building
Installation of cable couplings
Cable laying
Installation of a cable metalwork
Installation of accumulators
Complex of constructions of the Fire house
Laying of cable communications
Installation of system of lighting
Installation of gas fire extinguishing
Central control panel
Laying of cable conductors
Construction for the modular block of 0,4 kV
switchgear.
Arrangement of the base
Filling the base with soil
3
Serov SDPS
PGU
Installation of external and internal contours of grounding.
Electrical lighting
Installation works of means of instrumentation and automated control systems
Automation of air handling unit
Installation of electrical equipment
Outdoor switchgear ORU of 110 kV
Outdoor switchgear ORU of 220 kV
Installation of cable crossing points
Installation of a cable of secondary switching
Replacement of the equipment.
Installation of the equipment of secondary switching.
Fire-prevention pump station
Installation of electrical lighting
Installation of external and internal contours of grounding
Installation of the low-voltage equipment
Chemical water purification building
Installation of cable products
Complete switchgear (KRU) of 6 kV
Installation of electric lighting
Installation of the electrical equipment
Installation of cable products.
Installation of current distributor
Chimney
Installation of warning lights
Installation of lightning protection
Main building
Installation of lighting.
Installation of current distributors of generator voltage
Installation of equipment
Installation of inputs of the generator
Installation of transformers of current of the generator
Installation of cable routes
Installation of chains of protection and automatic equipment
Circulating pump station
Installation of working, emergency light and socket network.
Installation of the low-voltage equipment.
Installation of power cables.
Reserve transformer
Installation of equipment and materials.
Cable laying.
Automated transformer of communication
Installation of the automated transformer of communication.
Disel fuel pump station
Installation of a cable metalwork.
Central checkpoint
Step-up pump station
Installation of cable constructions and boxes.
Administrative and household building
Installation of cable constructions.
Complete gas-insulated switchgear (KRUE) of 220 kV
Installation of illumination of SN.
Installation of transformer
External lighting.
Instrumentation and automated control systems installation
Installation of automatic fire extinguishing system
Back to the list