2011


The “Zolotarevskaya” substation The “Zolotarevskaya” substation

The substation has been furnished with the following equipment: three 160 mVA power transformers, SF6 distribution points (220 kV), 4-section packaged distribution system (20 kV).

2nd and 3rd launch sites at the “Meschanskaya” substation 2nd and 3rd launch sites at the “Meschanskaya” substation

The work includes: cable passageways (220 kV) from the “Meschanskaya” SS through the “Butirki” SS to the “Krasnoselskaya” SS.

2nd launch site at the Novo-Kuzminki substation 2nd launch site at the Novo-Kuzminki substation

Work: cable passageways (220 kV) from the “Novo-Kuzminki” SS through the “Chagino” SS.

2nd launch site at the “Pererva” substation 2nd launch site at the “Pererva” substation

The work includes: cable passageways (220 kV) at the substation – transition point to the “Saburovo” and “Baskakovo” airways. Total length – 1995 meters.

Construction of the 2nd launch site at the “Krasnoselskaya” substation Construction of the 2nd launch site at the “Krasnoselskaya” substation

Scope of work: cable passageways (220 kV) at TPP-23, overall length – about 10200 meters.

Reconstruction of 6 RP-10kV units and 3 integral transformation substations Reconstruction of 6 RP-10kV units and 3 integral transformation substations

The job took place at the transformer substations

Design/construction of the 2nd launch site at the “Pervomayskaya” substation Design/construction of the 2nd launch site at the “Pervomayskaya” substation

The work is currently underway and includes: cable passageways (220 kV) from the substation – transition point No 208; total length – 3128 meters.

Work done at the Gribovo substation (750 kV) Work done at the Gribovo substation (750 kV)

The range of jobs there included electrical equipment and other types of installation activities on the entire auxiliary equipment network.