Work done at the Gribovo substation (750 kV)

 

Work done at the Gribovo substation (750 kV)

The range of jobs there included electrical equipment and other types of installation activities on the entire auxiliary equipment network.

Scope of work:

  • Installation of 170 boxes (Relay protection, CAM, etc.)
  • One set of SSPTI equipment;
  • Two sets of SOPT equipment;
  • 120 metering points of AIIS KUE;
  • Provision, laying, connection of 570 kilometers’ worth of control cable.

See more

Work done at the Gribovo substation (750 kV) Work done at the Gribovo substation (750 kV) Work done at the Gribovo substation (750 kV) Work done at the Gribovo substation (750 kV) Work done at the Gribovo substation (750 kV) Work done at the Gribovo substation (750 kV) Work done at the Gribovo substation (750 kV) Work done at the Gribovo substation (750 kV) Work done at the Gribovo substation (750 kV)