The “Zolotarevskaya” substation

The substation has been furnished with the following equipment: three 160 mVA power transformers, SF6 distribution points (220 kV), 4-section packaged distribution system (20 kV).
Presently we are putting together the initial design documentation, and getting the place ready for the upcoming construction activities.  The substation is going to be connected to the high-voltage TPP-20 power grid through two 220 kV lines as well as to the “Presnya” substation (each line is 5 km long).
Substation address: facility 11, Novoluzhnecki pr., Moscow.
Customer:  OAO“Energocomplex”