Developing of industrial control system of Konakovsky SDPS 6th power unit. Developing of industrial control system of Konakovsky SDPS 6th power unit.

Konakovsky SDPS. Accomplishment of the complex of works on developing of industrial control system of Konakovsky SDPS 6th power unit.

Novo-Ryazanskaya SDPS, electrical installation and commissioning works Novo-Ryazanskaya SDPS, electrical installation and commissioning works

Electrical installation and commissioning of masout department, installation of equipment on indoor switchgears ZRU 35 kV, ZRU-110, main switchgear GRU-6 (replacement of cells).

Smolensk nuclear power plant. Modernization and overhaul of liquid waste storage HZhO-2 Smolensk nuclear power plant. Modernization and overhaul of liquid waste storage HZhO-2

HZhO-2 modernization, technical rearmament and overhaul of systems important for safety; works according to GAN and VPO instructions. 

Installation and construction works on substation Talashkino

Installation, construction, commisioning works on replacement of AT-2 on substation of 330 kV Talashkino (with supply of equipment).

Expansion of outdoor switchgear ORU-110 kV on Smolensk HEPS-2 Expansion of outdoor switchgear ORU-110 kV on Smolensk HEPS-2

Expansion of outdoor switchgear ORU-110 kV — construction of indoor switchgear ZRU-6 kV on Smolensk HEPS-2 for connection of PNS No. 3 on 2 Verkhny Volok St.

Electrical installation works on substation Ochakovo Electrical installation works on substation Ochakovo

Installation of relay protection of 220 kV and control cables. 

Complex of electrical installation works on Kostroma SDPS Complex of electrical installation works on Kostroma SDPS

Outdoor switchgear ORU 220 kV. Reconstruction of relay boards, installation of schemes of high-voltage switches heating.

Ivanovo HEPS-3. Reconstruction of the boiler unit gas equipment. Ivanovo HEPS-3. Reconstruction of the boiler unit gas equipment.

Reconstruction of the boiler unit gas equipment No. 3 TP-87 on Ivanovo HEPS-3.

Installation of power supply system on object 15/155-3k

Installation of power supply system on object 15/155-3k (Teykovo, Ivanovo Region).

Installation works at steam-gas HEPS of Rodniki Installation works at steam-gas HEPS of Rodniki

Installation works on the boiler room.

Reconstruction of remote control means of Ivanovo HEPSs Reconstruction of remote control means of Ivanovo HEPSs

Reconstruction of remote control means of Ivanovo HEPS-1, HEPS-2, HEPS-3


HEPS-9. 1st stage of electrical installation works on GTE-65 input HEPS-9. 1st stage of electrical installation works on GTE-65 input

HEPS-9. 1st stage of electrical installation works on GTE-65 input with generator of 65 MW and utilizer boiler with capacity of 90 tons of steam/hour.