Новости

Smolensk branch report in September 2014

28.10.2014

1. Rosenergoatom branch Smolensk NPP. Desnogorsk.

 

  • Reconstruction
    • Installation of the system of notification and fire evacuation of personnel of the 3rd power unit.
    • Fire protection system modernization in the 2nd power unit. Cable penetration technical state and performance characteristics renewal.
    • Building and installation of wireless communications system in process management based on the TETRA wireless telecommunications standard at Smolensk NPP.
    • Power supply scheme modernization for the consumers of the conditioning refrigerating station (HSK). Electrical installation works.
    • Seismic protection system installation at the 1st and 2nd power units
  • Nuclear waste reprocessing complex (KP RAO).
    • Electrical installation works.
    • Instrumentation and controls stands installation.
    • Radiation monitoring system installation.
    • Loading bridges electrical equipment installation.

 

2. NIKIMT-Atomstroy JSC

 

  • Storage and management of spent nuclear fuel. Spent nuclear fuel storage (HOYaT). Reconstruction. Extension. Electrical installation works.

 

3.  KVADRA, JSC branch - Western Generation. Smolensk HEPS -2, Smolensk.

  • Electrical equipment repair at the electrical workshop and the workshop of thermal automatics and control (TAI) of Smolensk HEPS-2.
  • Breaker back-up devices (UROV) installation at the 110 kW outdoor switchgear of Smolensk HEPS -2, KVADRA, JSC branch - Western Generation.

4. IDGC Center, JSC branch – Smolenskenergo.

 

  • Cable lines repair in Smolensk.

 

5. E.ON Rossiya, JSC. Smolensk state district power station.

 

  • Exhaust stack warning lights installation.

 

6. Federal Grid Company of Unified Energy System, JSC.

 

  • Replacement of the 110-750 kW VT for the 330kW substation, Roslavl. Construction and installation and pre-commissioning operations, materials and equipment delivery.

 

7. Dorojnik, LLC, Bryansk.

 

  • Fiber-optic communication lines installation in the telephone conduit, in the house distributing systems and residential houses low-voltage lines, optical distribution frames and terminal boxes installation (Bryansk, Bejitsky and Sovetsky districts).

 

Works planned for October 2014.

1. Rosenergoatom branch Smolensk NPP. Desnogorsk.

  • Reconstruction
    • Seismic protection system installation at the 1st and 2nd power units
    • Power supply scheme modernization for the consumers of the conditioning refrigerating station (HSK). Electrical installation works.
    • Building and installation of wireless communications system in process management based on the TETRA wireless telecommunications standard at Smolensk NPP.
    • Fire protection system modernization in the 2nd power unit. Cable penetration technical state and performance characteristics renewal.
  • Nuclear waste reprocessing complex (KP RAO). Electrical installation works.

 

2. NIKIMT-Atomstroy JSC

 

  • Storage and management of spent nuclear fuel. Spent nuclear fuel storage (HOYaT). Reconstruction. Extension. Electrical installation works.

 

3.  KVADRA, JSC branch - Western Generation. Smolensk HEPS -2, Smolensk.

 

  • Breaker back-up devices (UROV) installation at the 110 kW outdoor switchgear of Smolensk HEPS -2.
  • Electrical equipment repair at the electrical workshop and the workshop of thermal automatics and control (TAI) of Smolensk HEPS-2.

 

4. IDGC Center, JSC branch – Smolenskenergo.

 

  • Cable lines repair in Smolensk.

 

7. Dorojnik, LLC, Bryansk.

 

  • Fiber-optic communication lines installation in the telephone conduit, in the house distributing systems and residential houses low-voltage lines, optical distribution frames and terminal boxes installation (Bryansk, Bejitsky and Sovetsky districts).


More photo