+7 (495) 272-0871
Branches
in 5 cities of Russia
Divisions:
Moscow
Kostroma
Kurchatov
Smolensk
Plants:
Kurchatov
Design:
Kostroma engineering center
News
Company
About Us
List of Services
Structure
Clients and Partners
Testimonials
SRO licenses and certificates
Certificates
Information
For Shareholders
Services
Construction, installation and adjustment
General contract and design
Designing and manufacturing of equipment
Engineering, design works
Software development and support
Our Equipment
Manufacturing Capabilities
Environmental Protection
Projects
Contacts
Log in
Главная
Новости
Works performed by Kurchatov branch in January, 2014
03.02.2014
1.
Kursk nuclear power plant.
3rd power unit. Ventilation and air conditioning system.
Installation of equipment, installation of metal works. Laying of cable.
3rd power unit. Replacement of electric drives of armature.
Dismantle and installation of boxes of BEZ.
3rd power unit. Arrangement of systems of evacuation corridors smoke removal. Arrangement of air subtime on staircases.
Installation of equipment.
Replacement of the switchgear RU-0,4 equipment of 54th building.
Installation of equipment, pipes, terminations. Cable laying.
4th power unit. Arrangement of illumination level according to Construction Norms and Regulations in room 914/2.
Installation of lights.
1st and 4th power units. Illumination of fuel pools. Installation of a string of lights.
Wasted nuclear fuel storage (HOYaT). Bioprotection, room 153.
Dismantle and installation of metal works. Cable laying.
3rd power unit. Main building. Purchasing and installation of KIP (instrumentation and control) equipment.
Installation of a wire, devices. Cable laying.
2.
Novovoronezh NPP.
Control system of special wastewater treatment (SKU SVO) modernization regarding installation of operational panels №5.
Сovering a cable with flame retardant OGRAKS.
Laying of a fiber-optical cable.
Reconstruction of the room located between axes 14-16 mark. + 5,650. Installation of the PMN panels.
Cable routes RO and MZ.
Dismantle and installation of a cable.
3.
Stoylensky GOK.
Main step down substation GPP-06
Installation of the transformer, laying and connection of a cable.
Transformer oil warehouse. Installation of the fire alarm system.
4.
Vladimir HEPS-2.
Reconstruction of the Vladimir HEPS-2 with the installation of PGU-230 MW.
Installation of generating switches, current distributor of 6 and 20 kV, installation of assemblies of PR and cable metal works. Laying of the control and power cable.
5.
HEPS-1 in Kursk.
Installation of equipment, installation of cable metal works, installation of light and searchlight poles. Cable laying.
6.
HEPS of North-Western region (HEPS-SZR) in Kursk.
Cable laying. Reconstruction of panels of relay protection and automatic equipment