1. Chelyabinsk, Fortum JSC, Construction of 2 power units of the buildings No. 1, No. 2 (PGU-247 of 5 MW) of Chelyabinsk SDPS.
Installation of ceiling lighting in the main building;
2. Yaroslavl, Slavneft-YaNOS JSC, reconstruction of the system 25/7
Installation of a contour of grounding of system 25/7;
Installation of lighting system in pump and alkaline rooms and in the reactor unit ABK and system 25/7;
3. Volgorechensk. IDGC of Center-Kostromaenergo JSC. Substation of 110/35/10 KPD.
Dismantle and installation of two TDTN 25000/110 UHL1 power transformers;
Installation of portals of PSL-110 Ya4 – 2 items, PSL-110 Ya1 – 1 item;
Replacement of current transformers of 110 kV;
Installation of a flexible busbar of 110 kV and busbar bridge of 10 kV;
Installation of an external protection of substation;
4. Nyagan. Fortum JSC. Nyagan SDPS. 1,2,3rd launching complexes.
Territory.
Main buiding No. 2, 2nd launching complex.
Installation of a system of electrical laboratory power supply;
Installation of instrumentation and automated control systems of block desalinating installation and intra turbine pipelines of the Siemens AG steam turbine in turbine department;
Installation of equipment: assemblies of PR, assemblies of latches, storage battery;
Main building No. 3, 3rd starting complex.
Installation of electric equipment of GPM;
Installation of cable metal works, laying of a power and control cable, installation of systems of lighting and grounding;
Installation of local cable routes to the service equipment;
Installation of protective pipes to ZRA, installation of stands for a binding of instrumentation and automated control systems, control units of latches;
Preparation of electric part of an oil system for washing;
Installation of illumination of turbine department;
Installation of grounding of processing equipment;
Installation of instrumentation and automated control systems of the generator Siemens AG;
Installation of the storage battery Siemens AG;