A host of construction works has been done, including:
1. Installation of cable support constructions and cross-linked polyethylene cable laying (110 kV).
2. Control cable laying for the control/measuring devices across cable support constructions as well as through pipelines – done at the main building as well as some auxiliary adjuncts of the 110 MW CCGT of the Vologda TPP.
Customer: Branch «Vologda TPP» of ОАО«TGK-2».
General contractor: ZAO «Intertehelectro».