CCGT 110 MW at the Vologda TPP of OAO ‘TGK-2,” Vologda region

A host of construction works has been done, including:

1.   Installation of cable support constructions and cross-linked polyethylene cable laying (110 kV).

2.   Control cable laying for the control/measuring devices across cable support constructions as well as through pipelines – done at the main building as well as some auxiliary adjuncts of the 110 MW CCGT of the Vologda TPP. 

 

Customer: Branch «Vologda TPP» of ОАО«TGK-2».

General contractor: ZAO «Intertehelectro».


Back to the section