Renovation of the Tushino substation, Moscow.

ECM is now working toward the mechanization of the construction process:  paved trays, installed KTPN; paved the third wire cable, mount the remaining 6 cable boxes (requires shutdown, which is expected to 26.06.13g.).


Back to the section