+7 (495) 921-0871
in 5 cities of Russia
ECM is now working toward the mechanization of the construction process: paved trays, installed KTPN; paved the third wire cable, mount the remaining 6 cable boxes (requires shutdown, which is expected to 26.06.13g.).