The Novovoronezh NPP, 5th power unit.

The Kurchatov branch is now doing all the work in and around the 5th power unit, including:

 

-        Construction work at the general control equipment of the 5th unit;

-        Electrical-assembling work at the control valves; 

-        Construction work renovating the control boards and auxiliary equipment;

-        Replacement of overaged control equipment;

-        Construction work installing KRUZA equipment;

 

Period: since 7/9/12

Project owner:  OAO “Rosenergoatom Concern”  The Kursk NPP.


See more