Kursk NPP, installation of equipment, cable laying, installation of metal works
1. Kursk nuclear power plant.
4th power unit. PTK SKU BV.
  • Installation of equipment, cable laying, m/designs installation. 
Autochemical control-3,4 power units.
  • Installation of equipment. 
3rd power unit. UKLU replacement. Field networks. Reliable food.
  • Cable dismantle, equipment dismantle, cable laying. 
3rd power unit. Replacement of fire-retardant valves. Cable laying, installation of boxes of SK.
3rd power unit. Ventilation and conditioning. Installation of equipment, laying and connection of a cable.
3rd power unit. PTK SKU SVO. Equipment dismantle.
ORU-750кВ.
  • Replacement of switches 5I-V-1, 5I-V-0. 
4th power unit. Cable 0,4kB replacement by calculation on thermal firmness.
  • Cable laying. 
4th power unit. Modernization of system of excitement of TG-7, TG-8.
  • Equipment installation, laying and connection of a cable. 
4th power unit. Replacement of generating switches.
  • Switch replacement. 
Protected Point of Management (PPM) of PDG of of Kurchatov.
  • M/designs installation, installation of lamps, cable laying. 
2. New Voronezh nuclear power plant.
Modernization of a board of SVO.
  • Laying of a control cable. 
Cable routes RO and MZ.
  • Reduction of cable routes according to norms and requirements of safety rules. 
3. Stoilensky MPW.
GPP-06.  
  • Transformer installation, laying and connection of a cable. 
4. Kursk CHPP-1.
Installation of cable m/designs, installation of equipment, cable laying.