  1. Smolenskaya NPP (affiliate of OAO “Rosenergoatom”), Desnogorsk town
    • Replacement of the automatic fire alarm system
    • Renovation of the second power unit, including:
      • Setting up some control boards
      • Cable laying
      • Renovation of a control unit, putting in place some communication equipment including the setup of a local network as well as electrical feeds.
    • 3rd power unit. Renovation of the automatic fire alarm system
    • Replacement of wooden doors with steel ones (fire safety regulations)
    • Replacement of some C-transformers with ORU 330kV and 750kV
    • Renovation of alarm and automation systems on some PRK and DPU-800 battery boxes
    • Installation of some sensors for pre-explosive equipment that runs along the edges of tank batteries at the elevated tracks and pump stations (storages 1 and 2);
    • Renovation of furnace-oil alarm sensors. Installation of some pre-explosive equipment sensors;
    • Installation of a video surveillance system for the contamination control systems RZB-204 and installation of dosage meter distribution system
  2. OOO “Schit”
    • Nuclear waste reprocessing system. Launch area. Special area.
      • Road lighting system
      • Finalizing work. Axes 1-26
  3. OAO “NIKIMT-Atomstroy”
    • Installation of CRP (6kV) equipment “Stroybaza” (at the Smolenskaya NPP). 2nd turn. Spent nuclear fuel systems.
  4. OAO “QUADRA”
    • Repair of some EC&I equipment
    • Replacement of a 110kV sectioned circuit breaker
  5. “Smolenskenergo” (branch of OAO “MRSK Centra”)
    • Technological connections in Smolensk
    • Renovation of RP-7, located Kozlova st., Smolensk
    • Related repair work.
    • Setup of a temporary power feed for FGOU VPO “SGAFC&T,” located Gagarina pr., Smolensk
  6. OAO “Centroelectronaladka”
    • Renovation of the electric equipment at the “Vykhinskaya-2” substation