Work of the Moscow branch, April-May 2012

02.07.2012

1. The Nyagan GRES (Nygaan, Customer: Federal Network Enterprise “Unified Power Systems”).

  • EC&I – renovation/installation activities (equipment installation, electric boxes, joint equipment) in the turbine and boiler houses of PU1.
  • Lighting system setup, grounding grid around the open-air transformer area.
  • Power/control cable laying in/around the man building of the boiler and turbine houses of PU1.
  • Wielding equipment installation; control equipment of the PU (electric work).
  • Control equipment of some lifting devices in the main building.
  • Grounding grid, lighting systems at the onshore pump station.

2. “Novaya” substation (Customer: OAO “Unified Power Company").

  • Installation of some 20 kV resistors;
  • Grounding grid for some metal work constructions (for further installation of insulating elements);
  • Relay protection systems (control boards, installation);
  • Installation work on some local tracks.

3. Gas-turbine thermal plant “Scherbinka” (Customer/investor: OOO “EnergoPromInvest”).

  • Installation work at the sampling/test joint.
  • Power feed for the outdoor lighting system.

4. Eastern Electric Networks (an affiliated branch of OAO Moscow United Electric Company.

  • Transformer substations (renovation/installation activities).
  • Cable/overhead transmission lines.

5. Western Electric Networks (a branch of OAO “MUEC”).

  • Transformer substations (renovation/installation activities);
  • Cable/overhead transmission lines.

6. Southern Electric Networks (a branch of OAO “MUEC”).

  • Transformer substations (renovation/installation activities);
  • Cable/overhead transmission lines.

7. ”Gribovo” substation (Customer: “Unified Power Systems”).

  • Control cable laying;
  • Emergency control systems (installation of control boards).

8. TPP-22 (an OAO “Mosenergo" branch). Customer: OAO “Mosenergo” “Equipment renovation at the ORU 220/110 kV").

  • Removal of bus arrangements;
  • Removal of a tie-breaker and some support metalwork constructions.

9. “Moscow Oil Reprocessing Plant," OAO “Gaspromneft – MNPZ,” “Internal Power System at GPP1 and GPP2”.

  1. GPP1:
    • Power feed and facility arrangement for the construction site;
    • Landscape layout around GPP-1 for consequent work toward creating the foundation for temporary power units of RU-6kV;
    • Grounding grid – installation; lighting protection systems;
    • Foundations for temporary power units.
  2. GPP2:
    • Power feed and facility arrangement for the construction site;
    • Landscape layout around GPP-2 for consequent work toward creating the foundation for temporary power units of RU-6kV.

10. “Mira” station (Customer: OAO “MTK”).

  • Removal of power cable;
  •  Removal of some 10/0,4 kV transformers;
  • Removal of some РУ-6 kV transformers;
  • Removal of auxiliary boards.

11. “TMB”, Dolgoprudny (OOO Henkel-Rus).

  • Lighting system in the storehouse;
  • Boxed equipment – installation work.