News

Moscow corporate branch – work done in January, 2012

01.02.2012

 

Full list of projects:

  1. Customer – FSK EES. Kalininskaya NPP – Gribovo SS with further expansion of the latter.
    • fiberglass cable work at relay protection facilities;
    • relay protection boards – cable work;
    • relay-protection equipment – installation works;
    • relay protection for power metering systems.
  2. Customer – OAO “OEK” (“Novaya” substation).
    • installation of isolating switches (20 kV);
    • control wiring (secondary switchgears, 220kV).
  3. GTTPP “Schervinka”. Customer/investor – OOO “EnergoPromInvest”:
    • Cable gallery. Preparation of as-built files;
    • Fire-fighting pump room:
      • automated fire-safety system;
      • power/control cable work;
      • low-amperage circuits;
    • water-heating boiler room No1:
      • EC&I equipment arrangement;
      • automated equipment for the ventilation system of the boiler room No1;
      • low-amperage circuits in the boiler room.
    • Grounds. power/control cable work;
    • Preparation of as-built files.
  4. Eastern Power Systems (an OAO “MOESK” branch):
    • transformer substation (installation work);
    • overhead/cable transmission lines.
  5. Western Power Systems (an OAO “MOESK” branch)
    • transformer substation (installation work);
    • overhead/cable transmission lines.
  6. Southern power systems, an OAO “MOESK” branch
    • transformer substation (installation work);
    • overhead/cable transmission lines.
  7. Central power systems, an OAO “MOESK” branch. Installation of 2 additional sections into RU-110 kV at the “Butyrki” SS for further connection to the “Meschanskaya” SS. Preparation of as-built files.
  8. TPP-20, an OAO “Mosenergo” branch. Renovation of SSG-6kV.
    • ventilation system installation;
    • Preparation of as-built files.


More photo

Back to the list