Moscow corporate branch – work done in Q42010

25.01.2011

 

  1. “Krasnoselskaya” substation. Customer – OAO “Energocomlpex”
    • automated fire-safety system;
    • security system;
    • fire alarm system, installation;
    • lighting system setup;
    • ventilation system, air-conditioning;
    • remote-control systems;
    • relay protection control-boards, incl. cable work;
  2. TPP-11, an OAO “Mosenergo” branch.GRU-10 kV. Customer - OAO “Mosenergo.”Work completed in December 2010
    • renovation of GRU-10kV (2nd section) KRU-10kv;
    • rigid busbar systems with insulation replacement;
    • testing/launch work with electrical equipment;
    • exterior décor works.
  3. TPP-20, an OAO “Mosenergo” branch.Customer – OAO “Mosenergo.”Equipment replacement work (control board, 0,4 kV and cable network)
    • equipment provision;
    • Removal of a T1;
    • temporary rewiring;
    • removal of 0.4 control boards;
    • installation of a 0.4 control board;
    • cable work;
    • general construction activities;
  4. “Novo-Izmailovo” substation. Customer – OAO “Energocomplex”
    • ventilation system;
    • metalwork cable passageways for 0.4 cable network (control/auxiliary wiring);
    • grounding grid.
    • metalwork constructions, rigid busbar systems @ current-limiting reactor rooms;
    • lighting system setup;
    • isolating switches, 20 kV;
  5. KUTES-40. Customer – Chernyshov MMP, primary contractor – OOO “Energoavia-MT”
    • grounding grid.
    • cable work inside the main building;
    • Cable constructions across an overpass;
    • installation of KRU-6kV boxes;
    • lighting system setup;
    • CAD systems, installation.
  6. “Novo-Kuzminki” substation. Ordering party - OAO “ECM”
    • security system;
    • in-house communication network;
    • commissioning paperwork.
  7. Customer – ZAO “Les” (Egorievsk, Moscow Region)
    • installation of 2 power transformers (BUTS-1000);
    • cable work, 10kV, 0.4kV, incl. wiring and connection;
    • commissioning paperwork.
  8. Southern power systems, an OAO “MOESK” branch. Customer – “YuES”
    • transformer substation (installation work);“Klenovo 1,2,3,” “Batybino 1,2,” “Ryazanovo,” Emtsovo.”
  9. Customer - “Atomstroyexport”
    • installation of 2 unitized transformer stations;
    • cable work;
    • commissioning paperwork.

Work still running at TPP-9, TPP-12, TPP-20 of OAO “Mosenergo.”