Work done by the Novomoskovsk branch in April, 2011

26.04.2011

 

At the “Krasnoselskaya” substation

  • Commissioning of the 20kV switchgear

 

At the “Novo-Izmailovskaya” substation

  • Preparation work;
  • Power transformer testing activities;

 

At the “Belozyorskaya” substation

  • Preparation work;
  • Power transformer testing activities;

 

At the “Kollontay” substation

  • Installation of a TRDN 63000/10 power transformer (1 unit);

 

TPP-14 (“Pervomayskaya”)

  • Cordage/installation of several transformers;
    • TDC 100000/110 – 1 unit;
    • TDC 80000/110 - 1 unit;

 

Kishirskaya GRES

  • Installation of a few transformers; TDC 400МВА/330kV - 1 unit;

 

At the “Belozyorskaya” substation

  • AODCT 417000/750/500 – 1 unit;
  • AODCT 417000/750/500 – 1 unit (installation without oil equipment)
  • TMNL 16000/10 – 1 units.
  • AODCT 167000/500/220 - 1 unit (installation without oil equipment)

 

Kishirskaya GRES

  • Lighting system setup (natural gas heater);
  • Grounding grid (NGH)
  • Electrical wiring of a NGH crane;
  • Installation of a feed control-board;
  • Power/control cable work;
  • Metalwork constructions;
  • Relocation of a transformer substation;
  • Relocation of the overhead transmission line;
  • Installation of CAD boxes;
  • Installation of secondary EC&I equipment;
  • Installation of general EC&I and related equipment;
  • Molding work.

 

Kashirskaya GRES

  • Work completed at replacement of the TRDN-32000/110 power transformer;

 

Kharanorskaya GRES

  • Equipment installation at express-laboratory;
  • Grounding grid at main building;
  • 6 kV cable laying
  • 6kV sockets;
  • Cable passageways at boiler house;
  • Lighting system setup;
  • Metalwork constructions;
  • Installation of a DC control-board;
  • Storage batteries;
  • Control cable laying/connection;
  • Installation of impulse pipes, boards, EC&I sensors.

 

“Novaya” substation, Lipetsk

  • Replacement of 220 kV breakers.
  • Relay protection system – replacement.

 

GPP-19

  • Installation of a capacitance current compensation system (35kV);

 

Cable joints (220kV) at “Krasnoselskaya” substation

  • SF6 installation work (220 kV);
  • Cable support constructions, 220kV (installation work);

 

Novo-Kuzminki – “Tchagino” substation

  • 220kV joint sockets;
  • Cable support constructions, 220kV (installation work);

 

 

KrasnodarTPP

  • OSG 110kV:
    • Replacement of 110 kV breakers.
  • OSG 220kV:
    • Replacement of 220 kV breakers.
  • OSG 220kV, new line:
    • Equipment installation work;
    • Flexible busbar system;
    • Cable constructions across an overpass (220kV);
  • Main building:
    • Cable passageways at A-B, C-G lines;
    • Current leads at supporting facility;
    • Lighting system setup (lamps, cable) in the main building, in the exhaust-heat boiler room, in the machinery room etc.;
    • Electrical wiring of loading equipment;
    • Equipment installation for feed systems and frequency converters (PT, RU-6kV, RUSN-0.4kV);
    • Equipment installation, RU-6/0.4kV;
    • Storage batteries;
    • Cable laying
  • DKS:
    • Indoor grounding grid;
    • Equipment installation work (RU-6/0.4 kV);
    • Lighting system setup;
  • NGT:
    • Temporary supply equipment installation;
    • Indoor grounding grid;
    • Equipment installation work (RU-0.4 kV);
    • Lighting system setup;
  • BPPG:
    • Outdoor grounding grid;
    • Metalwork constructions;


More photo