Новости

Moscow corporate branch – work done in June 2011

27.07.2011

 

Full list of projects:
TPP-20, an OAO “Mosenergo” branch. Customer – OAO “Mosenergo.” Renovation of KRU-6kV.
control cable laying activities;
control wiring KRU-6kV;
testing activities at the KRU-6kV sections
commissioning paperwork.
 
“Novo-Izmailovo” substation. Customer – OAO “Energocomplex”
lighting system setup;
relay protection equipment – installation, relevant cable work;
low-amperage circuits;
in-house circuits – board installation;
commissioning paperwork.
 
Southern power systems, an OAO “MOESK” branch. Customer – “YuES”
installation of transformer substations: overhead and cable transmission lines;
 
TPP-0, an OAO “Mosenergo” branch. Customer – OAO “Mosenergo.” Replacement of a 0.4 kV circuit board (No 5).
lighting systems, board sockets (0.4 kV);
commissioning paperwork.
 
“Pervomayskaya” substation (“Vostochnaya”)
relay protection systems – installation;
relevant cable work for the relay systems;
cable connection work;
commissioning paperwork.
 
TPP-23, an OAO “Mosenergo” branch. Customer – OAO “Mosenergo.” Equipment replacement at SSG 220 & 110 kV
equipment installation (incl. busbar wiring at sections No10, SSG-220kV ShSV No213)
cable work through the section No10 joints;
 
 
 
 
 
 
TPP-17, an OAO “Mosenergo” branch. Customer – OAO “Mosenergo.” Equipment replacement at SSG 220 & 110 kV
equipment installation (incl. busbar wiring at sections of SSG-110kV, TPP-17, Luzhniki II )
cable work around the TPP-17 section;
 
TPP-26, an OAO “Mosenergo” branch. Customer – OAO “Mosenergo.” Equipment replacement at SSG-500kV (TPP-26 – “Pahkra” SS line)
removal of an air CB (500 kV)
removal of RPG-500 & RDZ-35 insulator switches and one VT (NDE-500)
removal of a grounding system & a CT (500 kV)
installation of a SF6 breaker (500 kV)
installation of a CT (500 kV)
cable work through the TPP-26 – “Parkhra” SS section ;
 
Central power systems, an OAO “MOESK” branch. Customer – “YuES” Installation of 2 additional sections into RU-110 kV at the “Borisovo” SS for further connection to the “Shipilovskaya” SS.
construction work at SSG-110kV sections, foundation setup, supporting metalwork braces, etc.
cable work through the “Borisovo-Shipilovskaya 1,2” sections
 
KUTES-40. Customer – Chernyshov MMP, primary contractor – OOO “Energoavia-MT”
power cable laying work across an overpass.
 