+7 (495) 272-0871
Branches
in 5 cities of Russia
Divisions:
Moscow
Kostroma
Kurchatov
Smolensk
Plants:
Kurchatov
Design:
Kostroma engineering center
News
Company
About Us
List of Services
Structure
Clients and Partners
Testimonials
SRO licenses and certificates
Certificates
Information
For Shareholders
Services
Construction, installation and adjustment
General contract and design
Designing and manufacturing of equipment
Engineering, design works
Software development and support
Our Equipment
Manufacturing Capabilities
Environmental Protection
Projects
Contacts
Log in
Главная
Новости
Moscow corporate branch – work done in June 2011
27.07.2011
Full list of projects:
TPP-20, an OAO “Mosenergo” branch. Customer – OAO “Mosenergo.” Renovation of KRU-6kV.
•
control cable laying activities;
•
control wiring KRU-6kV;
•
testing activities at the KRU-6kV sections
•
commissioning paperwork.
“Novo-Izmailovo” substation. Customer – OAO “Energocomplex”
•
lighting system setup;
•
relay protection equipment – installation, relevant cable work;
•
low-amperage circuits;
•
in-house circuits – board installation;
•
commissioning paperwork.
Southern power systems, an OAO “MOESK” branch. Customer – “YuES”
•
installation of transformer substations: overhead and cable transmission lines;
TPP-0, an OAO “Mosenergo” branch. Customer – OAO “Mosenergo.” Replacement of a 0.4 kV circuit board (No 5).
•
lighting systems, board sockets (0.4 kV);
•
commissioning paperwork.
“Pervomayskaya” substation (“Vostochnaya”)
•
relay protection systems – installation;
•
relevant cable work for the relay systems;
•
cable connection work;
•
commissioning paperwork.
TPP-23, an OAO “Mosenergo” branch. Customer – OAO “Mosenergo.” Equipment replacement at SSG 220 & 110 kV
•
equipment installation (incl. busbar wiring at sections No10, SSG-220kV ShSV No213)
•
cable work through the section No10 joints;
TPP-17, an OAO “Mosenergo” branch. Customer – OAO “Mosenergo.” Equipment replacement at SSG 220 & 110 kV
•
equipment installation (incl. busbar wiring at sections of SSG-110kV, TPP-17, Luzhniki II )
•
cable work around the TPP-17 section;
TPP-26, an OAO “Mosenergo” branch. Customer – OAO “Mosenergo.” Equipment replacement at SSG-500kV (TPP-26 – “Pahkra” SS line)
•
removal of an air CB (500 kV)
•
removal of RPG-500 & RDZ-35 insulator switches and one VT (NDE-500)
•
removal of a grounding system & a CT (500 kV)
•
installation of a SF6 breaker (500 kV)
•
installation of a CT (500 kV)
•
cable work through the TPP-26 – “Parkhra” SS section ;
Central power systems, an OAO “MOESK” branch. Customer – “YuES” Installation of 2 additional sections into RU-110 kV at the “Borisovo” SS for further connection to the “Shipilovskaya” SS.
•
construction work at SSG-110kV sections, foundation setup, supporting metalwork braces, etc.
•
cable work through the “Borisovo-Shipilovskaya 1,2” sections
KUTES-40. Customer – Chernyshov MMP, primary contractor – OOO “Energoavia-MT”
•
power cable laying work across an overpass.
More photo
Back to the list