News

Smolensk branch report in May 2015

31.05.2015

1. Rosenergoatom branch Smolensk NPP. Desnogorsk.

 

·         Reconstruction

o    Consumers power supply scheme modernization of the conditioning refrigerating station (HSK). Electrical installation works.

o    Replacement of vinyl-plastic air ducts in generator circuit-breakers’ facilities at power unit #1.

o    Lighting system modernization.

o    Replacement of the radiation monitoring system of the working site and defensive accident-prevention shelter at the power unit #2.

o    First stage nitrogen-oxygen plant #1 air separation units replacement (AKS-1). Construction works.

·         Nuclear waste reprocessing complex (KP RAO).

o    Electrical installation works.

o    Instrumentation and controls stands installation (KIPiA).

o    Radiation monitoring system installation.

 

2. NIKIMT-Atomstroy OAO

 

·        Storage and management of spent nuclear fuel. Spent nuclear fuel storage (HOYaT). Reconstruction. Extension. Electrical installation works.

 

3. IDGC of Centre OAO

 

·         Cable lines repair in Smolensk.

·         Cable lines installation at the object “KL-6kV, TP-6/0.4kV, KL-0.4kV construction for technical connection of the electrical plants of the Grazhdanstroy, OOO for IDGC of Centre, OAO (Smolenskenergo branch) needs.”

4. Energostroymontazh, OOO

·         8th microdistrict trolley lines.

5. E.ON Russia, OAO

·         35/220kV outdoor switchgear cable ducts and concrete structures repair at Smolensk SDPS.

·         Elecrical equipment power supply of the boiler compartment of the 3rd power unit and electrical installation works connected to main board transfer at the Berezovskaya SDPS.

6. Dorojnik, OOO, Bryansk.

 

·         Fiber-optic communication lines installation in the telephone conduit, in the house distributing systems and residential houses low-voltage lines, optical distribution frames and terminal boxes installation (Bryansk, Bejitsky and Sovetsky districts).

 

Works planned for June 2015

 

1. Rosenergoatom branch Smolensk NPP. Desnogorsk.

 

·         Reconstruction

o    Consumers power supply scheme modernization of the conditioning refrigerating station (HSK). Electrical installation works.

o    First stage nitrogen-oxygen plant #1 air separation units replacement (AKS-1). Construction works.

o    Replacement of the radiation monitoring systems.

·         Nuclear waste reprocessing complex (KP RAO) of Smolensk NPP. Electrical installation works.

2. NIKIMT-Atomstroy OAO

 

·        Storage and management of spent nuclear fuel. Spent nuclear fuel storage (HOYaT). Reconstruction. Extension. Electrical installation works.

 

3. IDGC of Centre OAO

 

·         Cable lines repair in Smolensk.

·         Cable lines installation at the object “KL-6kV, TP-6/0.4kV, KL-0.4kV construction for technical connection of the electrical plants of the Grazhdanstroy, OOO for IDGC of Centre, OAO (Smolenskenergo branch) needs.”

4. Energostroymontazh, OOO

·         8th microdistrict trolley lines.

5. E.ON Russia, OAO

·         Elecrical equipment power supply of the boiler compartment of the 3rd power unit and electrical installation works connected to main board transfer at the Berezovskaya SDPS.

6. Dorojnik, OOO, Bryansk.

 

·         Fiber-optic communication lines installation in the telephone conduit, in the house distributing systems and residential houses low-voltage lines, optical distribution frames and terminal boxes installation (Bryansk, Bejitsky and Sovetsky districts).



More photo

Back to the list