Works performed by Kurchatov branch in February 2015

02.03.2015

1. Kursk NPP

·         3rd power unit and spent fuel storage (HOYaT). Radiation control system (SRK) modernization.

T-joints, valves and detecting devices installation, installation of control cables, cable metalworks and equipment installation.

·         3rd power unit. Operating lifespan extension. 0,4kV shunt release replacement.

Busbars replacement.

·         3rd power unit. 164V transformer replacement.

Cable laying.

·         4th power unit. Operating lifespan extension. PTK VNIIEM equipment installation.

Equipment installation.

·         330 kV outdoor switchgear (ORU), disconnectors and voltage transformers replacement.

Control cable laying and dismantlement.

·         Automatic fire alarm system buildings and facilities fitting.

Cable laying, pipe installation.

2. Novovoronezh NPP-2

·         Instrumentation and control equipment and automatic process control system equipment installation at the 10UKC reactor auxiliary building of Novovoronezh NPP-2.

Power and control cable laying, gas fire fighting module installation, lamps, ducts, seal glands and cabinets installation.

3. Novovoronezh NPP 5th power unit

·         Special water treatment facility instrumentation and control system (SKU SVO) modernization in terms of operating panels and 5th power unit detector panels.

Cable connection in the current RTZO fits, cable allocation between the cabinets and internal commutation cable cores connection to the equipment, end sleeves installation.

·         K-500-60/1500 turbine capacitors replacement, replacing the cupronickel alloy tube system with noncorrosive alloy.

Cable metalworks installation and dismantlement.

4. Mikhailovsky GOK (mining and processing plant)

·         Pelletization block of the kilning machine No. 3 technological complex. Mixing and homogenization section.

Carriers installation, cable laying, lamps, switchgear, cabinets, control blocks and transformers installation.

5. Kazachya compressor station (CS) (1st stage) of the Southern Corridor gas transmission system

·         Fuel Gas System site automatization. 

Control cable laying, protective tube, junction box, cable metalworks installation.

 



More photo