Новости

Smolensk branch report in January 2015

04.02.2015

1. Rosenergoatom branch Smolensk NPP. Desnogorsk.

 

·         Reconstruction

o    Fire protection system modernization in the 2nd power unit. Cable penetration technical state and performance characteristics renewal.

o    Consumers power supply scheme modernization of the conditioning refrigerating station (HSK). Electrical installation works.

o    Installation of the system of notification and fire evacuation of personnel in the administration building.

o    Seismic protection system installation at the 3rd power unit.

o    Radiation monitoring system installation at the security station #1.

o    First stage nitrogen-oxygen plant #1 air separation units replacement.

o    Installation and construction works.

·         Nuclear waste reprocessing complex (KP RAO).

o    Electrical installation works.

o    Instrumentation and controls stands installation (KIPiA).

o    Radiation monitoring system installation.

 

2. NIKIMT-Atomstroy JSC

 

·        Storage and management of spent nuclear fuel. Spent nuclear fuel storage (HOYaT). Reconstruction. Extension. Electrical installation works.

3. IDGC of Centre, JSC

 

·         Cable lines repair in Smolensk.

·         Cable lines installation at the object “KL-6kV, TP-6/0.4kV, KL-0.4kV construction for technical connection of the electrical plants of the Grazhdanstroy, Ltd. for IDGC of Centre, JSC (Smolenskenergo branch) needs.”

4. Energostroymontazh, Ltd.

·         8th microdistrict trolley lines.

5. E.ON Russia, JSC

·         35/220kV outdoor switchgear cable ducts repair at Smolensk SDPS.

·         Control and instrumentation equipment cable runs and links installation at the 3rd power unit of Berezovskaya SDPS.

6. Dorojnik, LLC, Bryansk.

 

·         Fiber-optic communication lines installation in the telephone conduit, in the house distributing systems and residential houses low-voltage lines, optical distribution frames and terminal boxes installation (Bryansk, Bejitsky and Sovetsky districts).

 

Works planned for February 2015

1. Rosenergoatom branch Smolensk NPP. Desnogorsk.

·         Reconstruction

o    Power supply scheme modernization for the consumers of the conditioning refrigerating station (HSK). Electrical installation works.

o    Fire protection system modernization in the 2nd power unit. Cable penetration technical state and performance characteristics renewal.

o    Refueling machine (RZM) training stand valves electric drives replacement.

o    Radiation control stations replacement at the 1st security desk of administrative building.

·         Nuclear waste reprocessing complex (KP RAO) at the Smolensk NPP. Electrical installation works.

  

2. IDGC Center, JSC branch – Smolenskenergo.

 

·      Cable lines repair in Smolensk.

·         Cable lines installation at the object “KL-6kV, TP-6/0.4kV, KL-0.4kV construction for technical connection of the electrical plants of the Grazhdanstroy, Ltd. for IDGC of Centre, JSC (Smolenskenergo branch) needs.” 

3. Energostroymontazh, Ltd.

·         8th microdistrict trolley lines.

4. E.ON Russia, JSC

·         35/220kV outdoor switchgear cable ducts repair at Smolensk SDPS.

·         Control and instrumentation equipment cable runs and links installation at the 3rd power unit of Berezovskaya SDPS.

5. Dorojnik, LLC, Bryansk.

 

·         Fiber-optic communication lines installation in the telephone conduit, in the house distributing systems and residential houses low-voltage lines, optical distribution frames and terminal boxes installation (Bryansk, Bejitsky and Sovetsky districts).

 



More photo

Back to the list