+7 (495) 272-0871
in 5 cities of Russia
1. Rosenergoatom branch Smolensk NPP. Desnogorsk.
· Reconstruction
o Fire protection system modernization in the 2nd power unit. Cable penetration technical state and performance characteristics renewal.
o Building and installation of wireless communications system in process management based on the TETRA wireless telecommunications standard.
o Power supply scheme modernization for the consumers of the conditioning refrigerating station (HSK). Electrical installation works.
o Installation of the system of notification and fire evacuation of personnel.
o Seismic protection system installation at the 3rd power unit.
o Electrolysis plant installation.
· Nuclear waste reprocessing complex (KP RAO).
o Electrical installation works.
o Instrumentation and controls stands installation.
o Radiation monitoring system installation.
o Loading bridges electrical equipment installation.
2. NIKIMT-Atomstroy JSC
· Storage and management of spent nuclear fuel. Spent nuclear fuel storage (HOYaT). Reconstruction. Extension. Electrical installation works.
3. Els, JSC. Desnogorsk.
· Housing development (located at Smolensk region, Desnogorsk, 5th microdistrict) electrical supply building and assembly works.
· Applicant’s power receivers integration at the housing development, 5th microdistrict.
4. KVADRA, JSC branch - Western Generation. Smolensk HEPS -2, Smolensk.
· Breaker back-up devices (UROV) installation at the 110 kV outdoor switchgear of the Smolensk HEPS -2, KVADRA, JSC branch - Western Generation.
· Replacement of the oil circuit breaker for the SF6 circuit breaker at the 110 kV outdoor switchgear of the Smolensk HEPS-2.
5. IDGC Center, JSC branch – Smolenskenergo.
· Cable lines repair in Smolensk.
6. Dorojnik, LLC, Bryansk.
· Fiber-optic communication lines installation in the telephone conduit, in the house distributing systems and residential houses low-voltage lines, optical distribution frames and terminal boxes installation (Bryansk, Bejitsky and Sovetsky districts).
Works planned for January 2015
o Refueling machine (RZM) training stand valves electric drives replacement.
o Electrolysis plant modernization.
o Radiation control stations replacement at the 1st security desk of administrative building.
· Nuclear waste reprocessing complex (KP RAO) at the Smolensk NPP. Electrical installation works.
3. KVADRA, JSC branch - Western Generation. Smolensk HEPS -2, Smolensk.
4. IDGC Center, JSC branch – Smolenskenergo.
5. Dorojnik, LLC, Bryansk.
Back to the list