Works performed by Novovoronezh branch in October-November 2014

05.12.2014

Customer/Object

Work done

1

Novovoronezh NPP

 

220 kV substation Novaya

Substation control building. Water and sewage systems installation.

Substation control building. Heating, air-conditioning and ventilation systems installation.

Substation control building.  Heating, air-conditioning and ventilation systems automatization.

220 kV outdoor switchgear. Equipment installation in 1, 4-11 cells.

Lighting installation at 220 kV and 500kV outdoor switchgear.

500 kV outdoor switchgear

Cable trenches cover slabs dismantling.

Cable trenches cover slabs installation.

Brick partitions installation.

Automated personal dosimetry monitoring system (APDMS)

Finishing works.

Electrical lighting installation.

Temperature monitoring system installation.

Nitrogen piping installation.

Automated personal dosimetry monitoring system equipment installation.

2

Novovoronezh NPP (under construction)

 

10 kV plant switchgear building

Cable laying and sealing.

Fire house facilities complex

Power equipment installation.

3

Serov SDPS

 

SF6 insulated switchgear

Subcommutation cable installation and sealing.

Protective circuit and autotransformer automatics installation.

Auxiliary transformer installation.

SF6 insulated switchgear lighting installation.

External lighting installation.

Cable installation.

Air-conditioning and ventilation systems installation.

Heating power supply installation.

Welding circuit installation.

ACS equipment power supply electrical materials installation.

Automatic fire suppressing system installation.

4

CS Kazachiya (compressor station)

10kV indoor switchgear electrical lighting installation.

10kV indoor switchgear power equipment installation.

Power transformer installation.