Works performed by Kurchatov branch in October 2014

05.11.2014

1. Kursk nuclear power plant

  • 3rd power unit and spent fuel storage (HOYaT). Radiation control system (SRK) modernization.

o   T-joints, valves and detecting devices installation, installation of control cables.

  • 3rd power unit. Operating lifespan extension. Air ventilation and conditioning system.

o   Equipment installation, cable laying, ducts installation and automated-circuit breakers replacement.

  • 4th power unit. Operating lifespan extension.

o   Pipe, t-joints and valves installation.

  • GR log. NPPG-1-3 and PGN-1,2,3 pumps motor replacement.

o   Dismantling and installation of cable runs. Dismantling and installation of heat insulation. Ducts and piping installation. Cable laying.

  • 330 kV outdoor switchgear (ORU). Disconnectors and transformers replacement. High-voltage gear replacement.

o   Cable laying.

2. Novovoronezh NPP-2

  • Instrumentation and control equipment and automatic process control system equipment installation at the 10UKC reactor auxiliary building.

o   Pulse tube installation, cable laying, cable metalwork installation, lamps installation.

3. Novovoronezh NPP 5th power unit

  • Special water treatment facility instrumentation and control system (SKU SVO) modernization in terms of operating panels and 5th power unit detector panels.

o   Embedded special water treatment facilities (SVO) and metalwork equipment dismantling and installation, cable cores disconnection in special water treatment facilities (SVO), panels installation.

4. Mikhailovsky GOK (mining and processing plant)

  • Pelletization block of the kilning machine No. 3 technological complex. Mixing and homogenization section.

o   Cable metalwork and equipment installation. Current-limiting reactor, cable laying.

5. Novogorkovskaya HEPS

  • Novogorkovskaya HEPS reconstruction with combined cycle gas turbine installation.
    • Power cable, current lead laying, Cable metalwork installation.