1. Kursk nuclear power plant
o T-joints, valves and detecting devices installation, installation and dismantling of cables.
o Equipment installation, cable laying.
· 4th power unit. Operating lifespan extension.
o T-joints and valves installation.
· GR log. NPPG-1-3 and PGN-1,2,3 pumps motor replacement.
o Dismantling and installation of cable runs. Dismantling and installation of heat insulation. Ducts and piping installation. Cable laying.
· 330 kV outdoor switchgear (ORU).
Disconnectors and transformers replacement. High-voltage gear replacement.
o Cable laying.
2. Novovoronezh NPP-2
· Instrumentation and control equipment and automatic process control system equipment installation at the 10UKC reactor auxiliary building.
o Cable laying, cable metalwork installation.
3. Novovoronezh NPP 5th power unit
· Special water treatment facility instrumentation and control system modernization in terms of operating panels and 5th power unit detector panels.
o Embedded special water treatment facilities and metalwork equipment dismantling and installation, cable cores disconnection in special water treatment facilities, panels installation.
4. Mikhailovsky GOK (mining and processing plant)
· Pelletization block of the kilning machine No. 3 technological complex. Mixing and homogenization section.
o Cable metalwork and equipment installation.