Works performed by Kostroma branch in August, 2014.

23.09.2014

  1. Nyagan state district power station. 1,2,3rd launching complexes.
    • Installation of a test and repair network of the cooling tower.
    • Installation of fire-resisting automatic equipment.
    • Installation of instrumentation and automated control systems (KIPiA) and industrial control system (ASU TP) of TMCh.
    • Installation of instrumentation and automated control systems of the steam turbine.
    • Installation of lighting TO, operating floors, noise-protective casing PT SAG.
    • Installation of PTK BOU.
    • Installation of instrumentation and automated control systems (KIPiA) and industrial control system (ASU TP) KU№3.
    • Installation of lighting of KO.
    • Fire protection of cable platforms.

  2. NPK Sim-Ross JSC Zagorskaya hydroelectric power plant HEPP-2
    • Installation of a heating belt
    • Warming of isolation joints

  3. IDGC of Centre branch of JSC - Kostromaenergo.
    • Reconstruction of substation KPD 110/35/10 kV:

      • Installation of equipment of 110 kV in the territory of outdoor switchgear ORU-110;
      • Installation of current transformers of 10 kV in cells of KRUN-10 kV;
      • Installation of voltage transformers of 10 kV in cells of KRUN-10 kV;
      • Installation of current transformers of 35 kV in MV-35 kV;
      • Laying of a control cable;
      • Balancing and commissioning of the equipment of outdoor switchgear ORU-110 of kV;
      • Startup-setup of system of OPS and telemechanics;
      • Reconstruction of the oil-receiving device;
      • Installation of cable trays;
      • Installation of road plates;
      • Installation of cable tray covers;
      • Installation of a busbar of 110 kV;

  4. KVARTS-GROUP JSC:
    • Reconstruction of an automatic fire extinguishing system and fire alarm system of the block No. 9 of Kostroma SDPS:

      • Installation of OPS sensors;
      • Laying of a control cable;
      • Installation of control devices.

  5. Fortum JSC
    • Construction of the power unit No. 1 of PGU-247,5 MW of the Chelyabinsk SDPS:

      • Welding network and lighting of the main building Electrical annexes in the rows A2-A. (Blok No.1 and No. 2)

        • Installation of boxes with the step-down insulated safe transformer;
        • Installation of light-emitting diode lamps;
        • Installation of electrical adjusting elements;
        • Cable laying;
      • Welding network and lighting of the main building Electrical stack in the rows V-G axes 5-8 (Block No.1 and No. 2)

        • Installation of dashboard of lighting;
        • Installation of electrical adjusting elements;
        • Installation of light-emitting diode lamps;
        • Installation of switch boxes;
        • Installation of cable designs;
        • Cable laying;
        • Installation of flameproof boxes;
      • Outputs of the generator (Block No.1)

        • Installation of EGRU;
        • Installation of the launching transformer of 5300 kVA;
        • Installation of the excitation transformer of 920 kVA;
        • Installation of the current distributor of 20 kV;
      • Open installation of transformers with reskating rinks. Electrical sketches (current distributors)

        • Installation of the current distributor TNE-20 of kV;
      • Electric equipment of the main building. Block part. Block No. 1. RUSN of 6 kV, RUSN of 0,4 kV

        • Installation of current distributor TZRK-6;
      • Case with outlet and a neutral wire of generator

        • Installation of the case with the outlet and the neutral wire of gas turbine generator;
      • Lighting and welding network of the main building. Boiler and deaerator room

        • Installation of light-emitting diode lamps;
        • Installation of electrical adjusting elements;
        • Installation of cable designs;
        • Cable laying;
      • Cable economy of the main building. Log of power cables. ShchPT. Block No. 1

        • Laying of a power cable;
      • Main building. GTU. Block No. 1. Electrical part

        • Cable laying;
      • Lighting and welding network of the main building. Extension to a constant end face in axes 01-1

        • Installation of light-emitting diode lamps;
        • Installation of electrical adjusting elements;
        • Installation of cable designs;
        • Cable laying;
      • Cable economy of the main building. Arrangement of cable metal designs in an axis 01-1 extension

        • Installation of cable designs;
      • Power supply of fans and illumination of a noise-protective casing of GTU. Block No. 1

        • Installation of light-emitting diode lamps;
        • Installation of electrical adjusting elements;
        • Installation of cable designs;
        • Cable laying;
        • Installation of temperature sensors;
        • Installation of boxes with clips;
        • Installation of flameproof lamps