In June-August, 2014 the Moscow branch carried out works on the following objects:
1. Mosenergo JSC branch - HEPS-12 “Construction of a power unit of the steam turbine plant PGU-220T”.
o Installation of local routes in the turbine hall from boxes of KP type– 400 pcs;
o Installation of cable metalworks (racks, regiments, trays) – 30 t;
o Laying and cutting of a power cable – 20000 m;
o Laying and switching of a control cable in room– 75000 m;
o Installation of the illumination network of the turbine hall-200 lamps
o Installation and connection of push-button posts at fireplugs – 60 pcs
o Installation and welding of an optical cable – 5000 m
o Installation of a network of illumination of-100 lamps
o Installation of cable metalworks – 5 t,
o Installation of cable routes to existing HEPS with cable boxes of KKB-P-095/06-2 type - 110 m, of
o the KKB-P-065/06-2 type - 470 m;
o Installation of cable routes to PPG cable boxes of KKB-3PO-05/02-2 type – 350 m;
o Installation of cable routes to DKU, BOA with cable boxes of KKB-P-095/06-2 type- 400 m and the KKB-P-065/06-2 type – 220 m, the KKB-ZPO-05/02-2 type – 286 m;
o Installation and bus arrangement of the KTPSN panels (the ventilatory cooler) – 24 pcs;
o Installation and bus arrangement of SN 6/0,4 kV transformers (the ventilatory cooler) – 3 pcs;
o Installation of cable routes to the ventilatory cooler cable boxes of KKB-P-065/06-2 type – 320 m;
o Installation of cable routes from existing HEPS to GShchU cable boxes like KKB-ZPO-05/02-2 – 74m.
o Preparation of executive documentation;
2. Substation 220/20/10 kV Kozhevnicheskaya, Moscow, Zhukov proezd, 21
o Installation of a slab grillage in axes 5-13/A-G mark. 5.2÷-4.8 m – 801 cub. m
o The device of columns and walls in axes 5-13/A-G mark. - 4.800÷-0.350 m – 234 cub. m
o Installation of a slab grillage in axes 4-5/A-G mark. - 1.500÷-0.700 m – 120 cub. m
o Installation of a slab grillage in axes 13-14/A-G mark. - 1.500÷-0.700 m – 120 cub. m
o Installation of columns and walls in axes 1-5/A-G and 13-17/A- G mark. - 0.700÷+3.500 m – 40 cub. m
o Installation of a plate of overlapping in axes 1-6/A-G and 12-17 mark. - 0.050m – 138 cub. m
o Installation of a plate of overlapping in axes 4-5/B-V 13-14/B-V mark. +4.000 m – 36 cub. m
o Installation of columns and walls in axes 1-5/A-G and 13-17/A-G on mark. +4.000 m – 40 cub. m
o Preparation of executive documentation
o Installation of an internal contour of grounding on a cable tunnel – 150 m
o Installation of a metalwork of HILTI of a cable tunnel – 2.5т.
o Installation of a base plate of monolithic walls and a plate of overlapping of a tunnel in axes 2-7/A-G mark. - 5.200÷-2.100 m – 175 cub. m
o Backfill of a cable tunnel soil – 600 cub. m
o Installation of a metalwork of HILTI of a cable tunnel – 800 kg
o Installation of grounding of a tunnel 50 m
o Installation of floor plates the oil collector -13 pcs
o Waterproofing of the oil collector 840 sq.m
o Device of a clamping asbotsementny wall 420sq.m
o Backfilling of an oil collector – 300 cub. m
o Installation of a concrete cable chambers KM1, SQ.KM, KM3 – 43 cub. m
o Laying of pipes between the KM1 and KSQ.M chambers
o Installation of a holder device – 256 m
3. "Moscow Refinery (MNPZ) " of Gazpromneft JSC —"Internal power supply of GPP1, GPP2 and GPP3"
o Laying and a switching of a control cable in RShcP GPP-2 – 1910 m;
4. "Moscow Refinery» (MNPZ) of Gazpromneft JSC "External power supply of KRUE-220"
5. "Moscow Refinery» (MNPZ) of Gazpromneft JSC "External power supply. Reconstruction of indoor switchgear (ZRU) of 110 kV":
6. "Moscow Refinery» (MNPZ) of Gazpromneft JSC "Reconstruction of publicizing of the G-43 installation":
7. Substation "Krasnogorka" Customer: MOESK JSC. Reconstruction of the equipment of outdoor switchgear (ORU) – 110 kV.
o Installation of bases for portals and electric equipment – 39 pcs;
o Installation of a metalwork for electric equipment - 17;
o Installation of outdoor switchgear (ORU) - 110 kV electrical equipment– 17 sets;
o Installation of ferroconcrete trays – 64 pcs;
o Laying of control cables, installation of secondary switching;
o Replacement of panels of relaying and automatics (RZA) – 6 pcs;
o Rewiring of indoor switchgear (ZRU) cells -10 kV;
o Installation of a flexible busbar – 35%;
o Installation of the RTOS reactor 10-3150-0,35 UZ - 3 phases;
o Dismantle of batteries – 104 elements.;
o Exterior finishing of buildings of substation control house OPU, indoor switchgear (ZRU) – 50%;
8. Substation of 110 kV "Zubovskaya" Customer: MOESK JSC. Replacement of transformers, reactors.
o Oil-immersed transformer TMG-1600/10 – 11 UHL1 – 2 pcs,
o Unipolar disconnector of RVO-10/630 – 2 pcs,
o Reactor of arc-suppressing RZDPOMA-1600/10-U1 – 2 pcs,
o Surge suppressor of nonlinear LVA-280-ADS – 6 pcs.
o Unipolar disconnector of PVO-10/630 – 2 pcs,
9. Reconstruction and providing of security of solid radioactive waste storages of State Scientific Center - Research Institute of Atomic Reactors JSC, Dimitrovgrad, Ulyanovsk Region.
o Construction of monolithic ferroconcrete floor plate – 117 cub. m
o Construction of monolithic walls– 14 cub. m
o Construction of monolithic overlapping - 32 cub. m
o Construction of monolithic sites of overlapping – 2,5 cub. m
o Installation of the protecting metalworks and metalworks of communications of covering beams – 4,3 t
o Installation of window openings – 52 sq. m
o Entrance to a technical cellar (installation of ladder blocks) – 12 pcs.
o Installation of trays of the special sewerage – 32 cub. m
o Installation of the protecting constructions (sandwich panels) - 1536 sq. m
o Construction of concrete floors on internal perimeter – 120 sq. m
o Installation of protection constructions from a roofing corrugated sheet – 823 sq.m
o Installation of protection constructions from a wall corrugated sheet - 922 sq.m
o Fire protection of metalworks – 557 sq.m
10. Reconstruction and rehabilitation of PLK State Scientific Center - Research Institute of Atomic Reactors JSC, Dimitrovgrad, Ulyanovsk Region.
o Dumping of a sand on a ferroconcrete ditch of the industrial and storm sewerage – 242 cub. m
o Installation of a ferroconcrete trays (including the whole complex of works) - 25 pcs
o Installation of pavings from precast floor slab, including the whole complex of works – 117 pcs.
11. Reconstruction and rehabilitation of PLK State Scientific Center - Research Institute of Atomic Reactors JSC, Dimitrovgrad, Ulyanovsk Region. Near-surface point of burial of radioactive waste.
o Construction of the bases and a floor slab– 65,6 cub. m
o Installation of frame metalworks– 7,3 t.
o Construction of the bases – 32,24 cub. m
o Installation of frame metalworks (a column, communication) – 7,5 t
o Construction of the bases – 1,5 cub. m
o Installation of a greasing pit – 8,8 cub. m installation of greasing platform AKPP – 1 piece.
o Construction of base blocks under the check point building – 11 pcs.
o Construction of the bases for armoured turret – 1,6 cub. m
o Installation of an armoured turret– 1 piece.