1. Smolensk nuclear power plant Rosenergoatom Concern JSC branch. Desnogorsk..

  • Reconstruction
    • Installation of system of notification and fire evacuation system of personnel of 3rd power unit
    • Implementation of LED lighting system in the rooms of the main building and external constructions of Smolensk NPP.
    • Modernization of electrical equipment of bridge cranes established in the central hall of 2nd power unit.
  • Implementation of alert system of evacuation on ABK. Construction and installation, commissioning works.
  • Installation of system of seismic protection of 1st and 2nd power units.
  • Additional equipping of ABK with radiation control installations.
  • Modernization of a gas contour board of 2nd power unit. Re-planning of the room 427/2 for placement of equipment of the gas contour control system and for arrangement of the air-conditioning system. Construction and installation, commissioning works.
  • Installation of electrical equipment of bridge cranes established in the nuclear waste reprocessing complex (KP RAO)
  • Nuclear waste reprocessing complex (KP RAO). Launching complex. Special building. Electric installation work. Installation of stands of instrumentation and automated control system and water fire extinguishing system. Installation of system of radiation control.

2. NIKIMT- Atomstroy JSC

  • Complex of systems of storage and operating with wasted nuclear power. Wasted nuclear power storage (HOYAT). Reconstruction. Annex. Electric installation work.
  • Installation of electrical equipment of bridge cranes set on nuclear waste reprocessing complex (KP RAO)

3. KVADRA, JSC, branch of Western Generation. Smolensk HEPS -2, Smolensk.

  • Repair of electrical equipment of electrical workshop and workshop of thermal automatics and control (TAI) of Smolensk HEPS-2.
  • Installation of the breaker back-up devices (UROV) of outdoor switchgear 110 kV of Smolensk HEPS -2.

4. IDGC of Centre JSC branch – Smolenskenergo.

  • Reconstruction of substation PS of 220 kV Vostok.
  • Installation and construction works on object "The distribution center combined with transformer substation TP (RTP-6/0,4 kV) to the address: Smolensk, per. Zapolny for needs of IDGC of Centre JSC branch – Smolenskenergo

5. E.ON Rossiya JSC. Smolensk state district power station.

  • Replacement of cable boxes on boxes from the zinced steel with delivery of materials and the equipment.


Planned works on objects in August, 2014.

1. Smolensk nuclear power plant Rosenergoatom Concern JSC branch. Desnogorsk.

  • Reconstruction
    • Implementation of system of LED lighting in rooms of the main building and external constructions of Smolensk NPP.
    • Modernization of electrical equipment of bridge cranes established on wasted nuclear power storage (HOYaT) and in the central hall of 2nd power unit.
  • Installation of system of seismic protection of 1st and 2nd power units.
  • Modernization of scheme of electrical supply of consumers of conditioning refrigerating station (HSK). Electric installation work.
  • Installation of equipment of gas analyzerers of 2nd power unit.
  • Installation of RZB on ABK.
  • Modernization of a gas contour board of 2nd power unit. Re-planning of the room 427/2 for placement of equipment of the gas contour control system and for arrangement of the air-conditioning system. Construction and installation, commissioning works.
  • Installation of electrical equipment of bridge cranes established in the nuclear waste reprocessing complex (KP RAO) of Smolensk NPP. Electric installation work.

2.NIKIMT-Atomstroy JSC

  • Complex of systems of storage and operating with wasted nuclear power. Wasted nuclear power storage (HOYaT). Reconstruction. Annex. Electric installation work.

3. KVADRA, JSC, branch of Western Generation. Smolensk HEPS -2, Smolensk.

  • Installation of the breaker back-up devices (UROV) of outdoor switchgear 110 kV of Smolensk HEPS -2.
  • Repair of electrical equipment of electrical workshop and workshop of thermal automatics and control (TAI) of Smolensk HEPS-2.

4. IDGC of Centre JSC branch – Smolenskenergo.

  • Installation and construction works on object "The distribution center combined with transformer substation TP (RTP-6/0,4 kV) to the address: Smolensk, per. Zapolny for needs of IDGC of Centre JSC branch – Smolenskenergo
  • Reconstruction of substation PS of 220 kV Vostok.

5. E.ON Rossiya JSC. Smolensk state district power station.

  • Arrangement of light warning of chimney.