Works performed by Novovoronezh branch in June-July 2014.

30.07.2014

Customer/Object
Type of work
1 Novovoronezh NPP
  • Substation of 220 kV Novaya
Dismantle of ferroconcrete supports
Dismantle of assembly ferroconcrete constructions
Installation of assembly ferroconcrete constructions
Arrangement of ferroconcrete bases
Dismantle of storage batteries
  • Outdoor switchgear ORU of 500 kV
Arrangement of transition to the electric channel
Sikla system installation for cable laying
Installation of a metalwork
Installation of basic racks for flights
Dismantle of electrical equipment
Installation of grounding of electrical equipment
  • Computerized system on individual
    dosimetric control (ASIDK)
Finishing works
Electrical lighting
Installation of system of heating, water supply, installation of sewerage

2 Novovoronezh NPP (under construction)
  • Switchgear of 10 kV building
Installation of electrical equipment
  • Complex of constructions of the Fire house
Installation of equipment
  • Construction for the modular block
    of 0,4 kV switchgear.
Backfilling of soil
3 Serov SDPS
  • Outdoor switchgear ORU of 110 kV
    Outdoor switchgear ORU of 220 kV
Installation of cable of subcommutation
Replacement of equipment
Installation of equipment of subcommutation
  • Chemical water purification building
Installation of cables
Installation of external and internal contours of grounding
  • Complete switchgear (KRU) of 6 kV
Installation of equipment of subcommutation
Installation of power cables
  • Main building
Installation of lighting
Installation of cable metalworks
Cable laying
Installation of internal contour of grounding
Installation of equipment of subcommutation
Installation of cable of subcommutation
  • Circulating pump station
Installation of cables
Installation of metalworks
  • Disel fuel pump station
Installation of the crane
  • Station point №1
Installation of cable metalworks
  • Flood prevention
Installation of cables


More photo