Works performed by Kurchatov branch in June 2014

04.07.2014
1. Kursk nuclear power plant

  • 3rd power unit and wasted nuclear power storage (HOYAT). Modernization of radiation control system (SRK).
    • Installation of metalworks, detecting device.

  • 3rd power unit. Arrangement of systems of smoke removal from evacuation corridors and an air subtime in staircases.
    • Installation of cable and equipment.

  • 4th power unit. Extension of operation term.
    • Installation of metalworks and equipment, laying of a cable.

  • Equipment with automatic installations of fire extinguishing and fire alarm system of rooms of the 4th power unit.
    • Installation of a protective pipe, cable laying.

  • Outdoor switchgear (ORU) of 330 kV. Replacement of switches of 330 kV and transformers of 330 kV.
    • Installation of metalworks, cable laying.

  • Outdoor switchgear (ORU) of 330 kV. Replacement of disconnectors of 330 kV RVL Kurskaya.
    • Installation of metalworks, cable laying.

  • Construction and installation works on the local computer network of the system of the account and control of nuclear materials.
    • Installation of equipment.

2. Novovoronezh nuclear power plant-2

  •   Installation of instrumentation and control. Installation of equipment of industrial control system on object: "The reactor auxiliary building 10UKC" of Novovoronezh nuclear power plant-2.  
    • Installation of pulse pipes, panels of instrumentation and control, metalworks, electric lighting, plug network, laying of a power and control cable


3. Novovoronezh nuclear power plant
  • Cable routes RO and MZ.
    • Installation of metalworks.

4. Mikhailovsky GOK
  • Building of pelletization of technological complex of the kilning machine No. 3
    • Installation of cable metalworks.

5. Kursk HEPS-1
  • HEPS-1 Line of ice melting
    • Transfer of lines of 35 kV.

6.Vladimir HEPS - 2
  • Reconstruction of the Vladimir HEPS - 2 with installation PGU-230 MW.
    • Installation of the internal contour of grounding. Laying and connection of a control and power cable.

7. Novogor’kovskaya HEPS
  • Installation of illumination of the main building
  • Installation of current distributors of 6 and 20 kV
  • Installation of cable metalworks on platforms