Works performed by Kurchatov branch in April 2014.

06.05.2014
1. Kursk nuclear power plant

  • 3rd power unit. Arrangement of systems of smoke removal from evacuation corridors and an air subtime in staircases
    • Cable laying.

  • 4th power unit. Extension of operation term.
    • Installation of metalworks, cable and devices.

  • 4th power unit. Extension of operation term. PTK SKU TO.
    • Installation of terminations, optical fiber transmission (VOLS), control cable.

  • Outdoor switchgear of 330 kV. Replacement of 20 sets of external disconnectors with grounding (RNDZ).
    • Installation of metalworks, cable laying.

  • External network of power supply of object " Fallout shelter for protecting 1200 person on the territory of nuclear power plant".
    • Laying and connection of a cable, installation of strip, installation of SKPT stuffing-box.

2. Novovoronezh nuclear power plant-2

  •   Installation of instrumentation and control. Installation of equipment of industrial control system on object: "The reactor auxiliary building 10UKC" of Novovoronezh nuclear power plant-2. 
    • Installation of pulse pipes, panels of instrumentation and control, metalworks, electric lighting, plug network, laying of a power and control cable.


3. Novovoronezh nuclear power plant
  • Modernization of SKU SVO regarding installation of operational panels No. 5.
    • Covering a cable with OGRAKS flame retardant.

  • Cable routes RO and MZ.
    • Installation of metalworks.

4. Stoilensky GOK
  • Main step-down substation GPP-06
    • Transformer installation, laying and connection of a cable.

  • Warehouse of transformer oil.
    • Installation of the fire alarm system.

5. Vladimir HPP-2
  • Reconstruction of the Vladimir HPP-2 with the combined cycle PGU-230 MW.
    • Installation of the current distributor of 6 kV, assemblies of PR, grounding. Laying and connection of a control and power cable.


More photo