Works performed by Novovoronezh branch in December, 2013.

payment order No.

Customer/object

Type of works

1

NUCLEAR POWER PLANT HB

PS 220kB "New"

Creation of cable routes in the territory

2

Novovoronezh NPP-2

- Building of the all-station switchgear of 10 kV

- Building of the switchgear of 500 kV

- Complex of constructions of the Fire station

Blind area device

Finishing works in the building

Facade finishing

Device of floors

Installation of trelliswork of an external wall protection

Cable laying

Installation of an internal contour of grounding

Installation of systems of ventilation and heating

Installation of the cupboard equipment

Installation of a contour of grounding

Installation of equipment of the complex gas-insulated device on voltage of 500 kV

Installation gas-insulated cable

Installation of systems of automation

Electric equipment installation

Electric lighting

Cable laying

3

Serov SDPS

- PGU

- Complete gas insulated switchgear KRUE 220

The device of trenches under cable lines 110 and 220 of kV

Installation of a cable metalwork

Installation of a contour of grounding

Installation of the panel board equipment

Installation of power electric equipment

Cable laying

Installation of a cable metalwork

Installation of system of lighting

4

JSC Voronezhsintezkauchuk

Lighting installation

5

PS-723 35/10kv "Flood plain"

Installation of equipment on Telemechanics system



More photo