During November-December, 2013 the Moscow branch carried out works on the following objects and types of works

27.12.2013
"Moscow Refinery" of JSC Gazpromneft — MNPZ "Internal power supply of GPP1, GPP2 and GPP3".

GPP1. (PS Kapotnya)
  • laying of a control cable – 3000 m; 
  • installation of cable connecting couplings – 6 pieces; 
  • preparation of executive documentation. 
GPP2. (PS Kapotnya)
  • busbar and binding of the power TRDN-63000/220-U1 transformer; 
  • preparation of executive documentation. 
GPP3. (PS Kapotnya)
  • laying of a cable of industrial control system, installation of secondary switching; 
  • fire protection of cable lines in the building ZRU-6kv; 
  • razvarka of optical cross-countries; 
  • VOLS measurement after installation; 
  • preparation of executive documentation. 
"Moscow Refinery" of JSC Gazpromneft — MNPZ "External power supply of KRUE-220".
  • laying of a cable of industrial control system and installation of secondary switching; 
  • installation of equipment of cases of a direct current (ShPT and MEAL); 
  • razvarka of optical cross-countries; 
  • measuring VOLS after installation; 
  • preparation of executive documentation.
"Moscow Refinery" of JSC Gazpromneft — MNPZ "Installation of hydrotreating diesel LCh-2000 fuels" general contractor "Promfinstroy".
  • installation of illumination of the block of torch columns; 
  • preparation of executive documentation. 
CHPP-12 Mosenergo branch of JSC "Construction of PGU-220T power unit".
  • installation of cable metal works electrotechnical rooms of the Main case mark +7.200; 
  • installation of cable m / to in zone PT of the Main case; 
  • installation of 7 sections RUSN-0,4kv and transformers of own needs – 7 pieces; 
  • SPT and AB installation; 
  • installation of current-limiting reactors on voltage of 6 kV – 2 pieces; 
  • installation of the smoothing reactor – 1 piece; 
  • installation of the current distributor of 20 kV from the generator to GRU transformers on a mark of +5,3 m – 60 m; 
  • installation of the current distributor of system of own needs of 0,4 kV; 
  • installation of the gas-insulated generating switch on a mark of +8,5 m; 
  • installation of illumination of the main case on a mark of +16.500 m; 
  • preparation of executive documentation.
PS "Kozhevnicheskaya" customer of JSC MOESK.
  • trench installation under a cable of temporary power supply; 
  • installation of transformer substation KTP-10kv; 
  • trench installation under a cable 0,4kB; 
  • improvement of the household town; 
  • installation of lighting build platforms on perimeter; 
  • installation of temporary power supply; 
  • installation of a temporary protection; 
  • device of temporary roads; 
  • preparation of executive documentation. 
PS "Zubovskaya" customer of JSC MOESK.
  • the device of ways reskating rinks for TRDTsN transformer installation – 80000/110; 
  • platform preparation under temporary storage of the transformer. 
PS 220/20 "Mnevniki" Customer of JSC OEK.
  • laying of a cable of a communication system; 
  • adjustment operation of the security alarm system; 
  • installation of ventilating B30÷B32 systems in a cable tunnel – 3 pieces; 
  • certification of ventilating systems - 56 pieces; 
  • preparation of executive documentation. 
PS "Krasnogorkaya" Customer of JSC MOESK. Equipment ORU-110kv reconstruction.
  • installation of hollow floors in rooms of ZRU of 6 kV and 10 kV; 
  • dismantle of transformers of current in cells of 6-10 kV – 15 pieces; 
  • installation of transformers of current in cells of 6-10 kV – 23 pieces; 
  • laying and keying of a control cable – 2000 m; 
  • laying and keying of a power cable of 6-10 kV – 1021 m; 
  • installation of couplings trailer on a cable of 10 kV – 24 pieces. 
Device of the industrial and storm sewerage (ISS) and construction of the storage of solid radioactive waste (SSRW) Dimitrovgrad Customer of JSC GNTs NIIAR.
  • installation and waterproofing of ferroconcrete trays of PLK – 27 pieces; 
  • the device and vertical waterproofing @/@ walls of a hangar of STRO storage – 88 CBM; 
  • installation of plates of a covering of a hangar of STRO storage – 64 pieces; 
  • the device of the bases – 50 CBM; 
  • installation of base beams – 7 CBM; 
  • the device of blocks of walls of cellars of the HTRO technological case – 30 pieces; 
  • the device @/@ walls of the technological case – 56 CBM; 
  • device of monolithic columns. 
Reconstruction of PS 110kB No. 551 PS "Pernatovo" for needs of MOESK ZES-branch of JSC.
  • installation of cells of 6 kV – 23 pieces; 
  • installation of tire bridges – 2 pieces; 
  • drilling of openings with application of boring and diamond installation under cable drivings – 78 pieces; 
  • laying of a power cable – 676 m; 
  • device of a fire-prevention water supply system; 
  • platform preparation under the transformer; 
  • installation of the automated gas extinguishing installation; 
  • the trench device under a cable and cable laying; 
  • balancing and commissioning of automatic installation of the security and fire alarm system, video surveillance; 
  • balancing and commissioning of automatic installation of the security alarm system, video surveillance; 
  • balancing and commissioning of ventilating systems OPU building. 
PS "New" - installation of a cable metalwork for the line of 20 kV.
  • installation of a metalwork for a cable of 20 kV in a cable tunnel and a cable channel; 
  • production of openings for cable drivings – 180 pieces. 
Boarding school in the city of Bezhetsk.
  • installation of a heating system of a roof of orphanage. 