Works performed by Cherepovets branch in November, 2013

24.12.2013
1 . Construction of the power unit No. 4 of Cherepovets state district power station on the basis of steam-gas technology, the block No. 4 (PGU-420). Performance of a complex of electric installation work of the electrotechnical equipment and instrumentation and automated control systems and industrial control system equipment (item of Kaduy of the Vologda region).

Since May, 2013 works are performed on an order of the St. Petersburg Management.

1 . Turbine office. Installation of a box of YaVZ, the trolley current distributor, traffic lights, m / to. Laying of the conductor grounding, a cable in the laid metalsleeves. Priming, coloring of metal works.

2 . Office of electrotechnical devices. Cable laying on the established designs and trays. Installation of seals trailer. Installation of a box of YaVZ, lamps, switches. Cable laying on the established designs.

3 . Boiler office. Installation of boxes of YaVZ, metal works, the flexible current distributor. Installation of a metalwork. Cable laying in metalsleeves, the conductor grounding. Priming, coloring of metal works.

4 . Platform of technological pipelines and cable boxes. Cable laying on the established designs and trays. Installation of seals trailer, metalwork. Priming, coloring of metal surfaces.

5 . Automation of technological processes. Cable laying on designs and in pipes. Installation of boxes metal, sockets plug, seals trailer. Accession to an electric network.

6 . Technical water supply. Cameras of switchings. Installation of a metalwork, lamps, switches. Cable laying on designs, the conductor grounding. Priming, coloring of metal surfaces.

2 . Construction of the power unit No. 4 of Cherepovets state district power station on the basis of steam-gas technology, the block No. 4 (PGU-420). Building of KRUE-220 of kV (item of Kaduy of the Vologda region):

1 . Support of external lighting. Construction works. Drilling of ditches. Device of reinforced concrete foundations. Installation of combined ferroconcrete one-piece support: under intermediate self-supporting support up to 0,6 m3 (Ст1) height 10м (STsS-0,8-10). Installation of mortgage details. Priming, coloring of metal surfaces. Lateral coating waterproofing.

2 . Fire-prevention actions. Fire protection of a metalwork. Fireproof covering metal the primed (GF-021 soil) of surfaces a material fireproof thermoextending "Ograks-V-SK" (Ograks-V-SK-1) for 5 times.

3 . External ladders. Designs metal. Installation of platforms with a flooring and a protection from sheet, corrugated, round steel and communications on platform racks from C245 steel. C235, St3ps-St. Installation of ladders rectilinear and curvilinear, fire with a protection from C245, C235 steel, St3sp5-St. Drilling in @/@ designs from vertical openings of 200 mm in depth (95мм) диаметром:12 mm. Installation anchor hairpins. Priming, coloring of metal surfaces.

4 . Plumbing and sanitary networks. Inputs and releases, Building of KRUE-220 of kV. Development of soil in a trench. Laying of pipelines of water supply from pressure head polyethylene pipes of low pressure. Laying of pipelines of heating and gas supply from steel seamless pipes diameter: 150 mm. Hydraulic test of pipelines of systems of heating, water supply system and hot water supply by diameter: to 200 mm. Seal of epiploons at pass of pipes through the bases or cellar walls diameter: to 300 mm. Conering manually trenches.

5 . Knot of input of network water. Pipelines. Thermal isolation of pipelines, KRUE-220 of kV. Isolation of pipelines by PAROC Pro Section 100 cylinders. Covering of a surface of isolation of pipelines leaf aluminum AD.1N. Identification coloring AM brand Unipol SBE-111 soil-enamel (green) in 2 layers.

6 . Knot of input of network water. Pipelines. Anticorrosive protection of pipelines, KRUE-220 of kV. Sandblast cleaning (metal sand) surfaces of pipelines. Undusting surfaces. Surface degreasing by white spirit. Coloring of surfaces by a primer BP-02 in 2 layers.

3 . Performance of a complex of installation and construction works of buildings "Circulating pump station, "Open installation of transformers" and works on power supply of a metal warehouse within implementation of the project "Construction of the power unit No. 4 of Cherepovets state district power station on the basis of steam-gas technology, the block No. 4 (PGU-420)".

1 . Internal networks of plumbing and sanitary. Installation of water heaters, gates, latches, flanges, water-measuring knots, counters of cold water, filters. Installation of mixers. Laying of pipelines of water supply. Installation of transitions, branches, cranes spherical coupling. Isolation of pipelines. Installation of toilet bowls, wash basins.

2 . Architectural concepts.

Walls. Laying of walls brick, partitions. Laying of crossing points bar. Installation of assembly products. Priming, coloring of metal surfaces.

Floors. Device of concrete coverings. The device of coverings from ceramic tiles on cement mortar. Device of bulk floors. Device of cement coverings. Device of a waterproofing glued.

Apertures. Installation of steel oar doors. Installation of doors from aluminum alloys, fire-prevention doors. Installation of gate oar. Priming, coloring of metal surfaces.

Installation of window blocks from aluminum shapes.

Roof. The roof device from membrane PVC. Warming of coverings by plates from mineral wool. The vapor barrier device from a film. Device of trenches suspended. Protection of roofs handrail.

Finishing works. Alignment of concrete surfaces, plaster of surfaces. Coloring by water emulsion structures. Facing of walls. Thermal insulation of walls plates from polyfoam of polystyrene PSB-S-25.

3 . Heating and ventilation.

Management knot. Installation of gates, latches, locks, valves, cranes of spherical, steel flanges. Installation грязевиков, filters for water purification. Laying of pipelines.

Heat supply. Installation of gates, latches, locks, valves of the return, cranes of checkpoints on pipelines. Installation of filters. Installation of air collectors. Laying of pipelines of heating and water supply. Hydraulic test of pipelines of systems of heating.

Ventilation. Installation of valves of the return. Installation of doors hermetic. Installation of umbrellas over mines from sheet steel. Installation of knots of pass of exhaust air shafts. Installation of lattices blind. Laying of air ducts from the sheet zinced steel.

4 . Automatic installations of water fire extinguishing. Installation of sprinklers, fittings flange, cranes spherical. Installation of steel pipelines, production of knot of pipelines. Installation of branches, transitions, tees, steel flanges. Device of the production pressure head sewerage. Installation of sleeves, installation of gates, valves. Laying of pipelines of heating and gas supply from steel seamless pipes. Priming, oil coloring.

5 . Fire-prevention water supply system, Technical water supply. Installation of units pump bladed centrifugal, sprinklers, fittings flange, cranes spherical. Installation of tanks metal for water. Installation of steel pipelines, production of knot of pipelines. Installation of branches, transitions, tees, steel flanges. Installation of sleeves, installation of gates, valves. Laying of pipelines of heating, gas supply and water supply from steel seamless pipes. Priming, oil coloring. Hydraulic test of pipelines.

6 . Fire-prevention actions. Fire protection of a metalwork. Fireproof covering of the metal primed (GF-021 soil) surfaces a material fireproof thermoextending "Ograks-V-SK" ("Ograks-V-SK-1) for 3 times.

4 . Reconstruction of VL of 220 kV Energy of 3, VL 220 kV Dull province – Cherepovets of 1 and VL 220 kV May Day with calling on PS of 750 kV Belozerskaya and reconstruction SHOUT 220 kV at PS of 220 kV of RPP-1.

1 . Laying of a control and information cable of system of industrial control system on PS RPP-1.

2 . LAN on PS RPP-1. Laying of twisted couple.

3 . Installation control and the ZRU power cable on PS RPP-1.

4 . AIIS KUE cable installation.

5 . Installation of fire-prevention seals in the building of KRUE of 220 kV.

5 . PGU of 110 MWt of the Vologda CHPP GU JSC TGC-2 across the Vologda region.

1 . Installation of a metalwork.

2 . Installation of tire support

3 . Installation of steel pipes, profiles punched.

4 . Laying of a control cable of instrumentation and automated control systems on cable designs and in pipes in the main case and on infrastructure objects in quantity.

6 . PS of 220 kV May Day. Reconstruction of ZRU (Cherepovets)

1 . Installation of the bases under portals – 8 pieces.

2 . Installation F-1 bases under reactors – 4 pieces.

3 . Installation of cable designs.

4 . Installation of cases of TM, ShOT, ShUR.