2013


CCGT 110 MW at the Vologda TPP of OAO ‘TGK-2,” Vologda region CCGT 110 MW at the Vologda TPP of OAO ‘TGK-2,” Vologda region

A host of construction works has been done, including

The Nyagan SDPS The Nyagan SDPS

Full range of activities regarding the provision of all necessary electric equipment, materials

The Novokuzminki substation The Novokuzminki substation

Location: Volzhskiy bulvar 1, South-East Municipal District, Moscow

The Meschanskaya substation. The Meschanskaya substation.

Some of the inventory on site includes: two power transformers, neutral grounding resistor

The ‘Pererva’ substation. The ‘Pererva’ substation.

Brief inventory: two power transformers, neutral grounding resistor, current-limiting reactors

The ‘Novaya’ substation. The ‘Novaya’ substation.

On-site are two power transformers, a neutral grounding resistor, current-limiting reactors

OAO ‘Gazpromneft-MNPZ’ OAO ‘Gazpromneft-MNPZ’

General construction work involves: Installation and setup of external utility networks

The ‘Kozhevnicheskaya' SS, Moscow.

Work has been commenced, presently clearing up the site after the previous parking lot

The ‘Mneviki’ substation,  Moscow. The ‘Mneviki’ substation, Moscow.

General construction work involves: Now doing final cleaning work and commissioning on 1st, 2nd and 3rd floors 

The fuel complex is now under technical retooling for further production of fuel elements for OAO ‘GNC NIIAR,’ Dimotrovgrad.

 

 From June, 6 through June, 20 the project owner had a special committee examining the site. 

Renovation of the solid radwaste buildings for OAO ‘GNC NIIAR’ in Dimotrovgrad. Renovation of the solid radwaste buildings for OAO ‘GNC NIIAR’ in Dimotrovgrad.

Foundation bearers are currently installed, 17 out of 18 are in place. 