Electrical Work at the 1st Power Unit of the Nyagan GRES

Customer:  OAO “E4 Group”

On this project, OAO “E4 Group” was the general contractor. The project involved the complete setup of three gas-vapor units (PGU-1, PGU-2, and PGU-3, capacity – 3x418 mW), (ready-to-operate project).  Customer: OAO “Fortum.”

The ultimate capacity of the plant is going to come to 1254 mW. The Nyagan GRES will then become one of the largest power facilities of the Tumen Region. This project is nothing short of unique because the work starts off from ground zero and in the end there will stand a full-fledged ready-to-use facility.  The entire job is basically a three-step plan. After the 1st and 2nd units have been launched, the total capacity of the station will amount to 5.4 billion kW/h per year, and once the 3rd unit kicks in, the plant is going to give roughly 8.6 billion kW/h of power per year.  The total capacity of each unit is projected to be about 418 mW. Budget: ~ 1.4 billion (euro). Considering the scope and extent of this project, its planned duration is going to be pretty much unprecedented.  The overall number of people involved in this project is over 3 thousand.   The chief supplier of equipment is Siemens.

ECM’s share of work on this project includes:

  • The provision of electrical equipment/materials, various setup activities at the 1st PU of the plant, incl. the installation of several power transformers. Contract No2010-348-OSN, 12/30/2010.
  • Equipment/material provision, electrical installation jobs etc.  Contract No2010-348-OSN/No29-11/49ASU, 4/12/2010.

The following companies/branches have also participated in this project:

In 2011 the scope of work at the Nyagan GRES included:

  1. Main building:
    • Current distributors, auxiliary current distributors, total length – 562 m.
    • Generator circuit-breaker (installation), 1 unit;
    • Installation of KTP-6kV, 32 sections;
    • RUSN-0,4 kV (incl. 4 transformers, 31 sections in all);
    • Installation of a DC control board, batteries (1 kV);
    • Metalwork constructions;
    • Control cable laying/connection, 250 km total;
    • Indoor/outdoor lighting systems;
    • EC&I and APCS systems.
  2. Make-up water building:
    • Metalwork constructions;
    • Indoor lighting system setup, 168 units total;
    • Wiring of 7 lifting devices.
  3. Cable overpasses. Types: B, F, D, C. 1500 sections installed.
  4. Auxiliary facilities. Other electrical installation/testing work.
The project is still underway. 

See more

Electrical Work at the 1st Power Unit of the Nyagan GRES Electrical Work at the 1st Power Unit of the Nyagan GRES Electrical Work at the 1st Power Unit of the Nyagan GRES Electrical Work at the 1st Power Unit of the Nyagan GRES

Back to the section